Search Subcontracts

2012919

Overview

Sub Description
Origins Spectral Interpretation Resource Identification Security Regolith Explorer (OSIRIS-REx) Thermal Emission Spectrometer (OTES)
Total Awarded
$3,077,394.00
Most Recent Award Date
Feb. 16, 2016
Place of Performance
Tempe, Arizona 85282-1895 United States
Prime Awardee
Prime Project Title
None
Prime Award

Award Hierarchy

Definitive Contract

NNG12FD68C

Subcontract

2012919

Related Subcontracts

Subcontracts under the same prime contract

Subcontract History

Disclosed subcontract actions

Prime Contract Details


Prime Status

Period of Performance
5/9/12
Start Date
11/12/16
Current End Date
11/12/16
Potential End Date
100% Complete

Obligations
$16.0M
Total Obligated
$16.1M
Current Value
$16.1M
Potential Value
99% Funded

Prime Overview

Original Description
CRITICAL FUNCTIONS IN THE PERFORMANCE OF THIS EFFORT THE CONTRACTOR IS THE ARIZONA STATE UNIVERSITY, SCHOOL OF EARTH AND SPACE EXPLORATION (SESE). ASU SHALL DIRECT ALL ASPECTS OF THE PROJECT DEVELOPMENT AND PROJECT SCIENCE EFFORTS, AND PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, FABRICATE, ASSEMBLE, INTEGRATE, AND TEST THE OSIRIS-REX OTES, ALONG WITH THE NECESSARY SOFTWARE AND GROUND SUPPORT EQUIPMENT TO SUPPORT THE OSIRIS-REX LAUNCH. AFTER LAUNCH, ASU SHALL PROVIDE SUPPORT FOR OTES PHASE E MISSION OPERATIONS: PHASE E WORK IS NOT COVERED UNDER THIS SOW. INSTEAD, OTES SUPPORT FOR PHASE E IS COVERED UNDER THE SPOC SOW. THE SCOPE OF ASU S WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: 1. MANAGE THE OTES TEAM THROUGH PHASE B, C, AND D OF THE OSIRIS-REX MISSION. 2. DEFINE THE REQUIREMENTS FOR OTES IN AGREEMENT WITH LEVEL-1 REQUIREMENTS. 3. DEVELOP A PRELIMINARY DESIGN FOR THE OTES INSTRUMENT THAT MEETS THE OTES SCIENCE GOALS AND OBJECTIVES, AND REQUIREMENTS. 4. DESIGN, DEVELOP, FABRICATE, INTEGRATE, TEST, AND DELIVER A FLIGHT-QUALIFIED OTES INSTRUMENT TO MEET THE OTES SCIENCE GOALS AND OBJECTIVES, AND REQUIREMENTS. 5. VALIDATE THE LEVEL 1 REQUIREMENTS THAT APPLY TO OTES AS WELL THE MISSION PERFORMANCE REQUIREMENTS. 6. INTEGRATE THE OTES INSTRUMENT ON THE FLIGHT SYSTEM AND SUPPORT FLIGHT SYSTEM LEVEL TESTING. 7. DEFINE THE SCIENCE DATA PROCESSING ALGORITHMS REQUIRED FOR THE MISSION. 8. SUPPORT THE DEVELOPMENT AND TESTING OF THE OTES FLIGHT SOFTWARE AT LOCKHEED MARTIN (REFERRED TO AS LM FROM THIS POINT FORWARD). 9. SUPPORT THE DEVELOPMENT OF THE OTES STANDARD DATA PROCESSING PIPELINE SOFTWARE TOOLS FOR THE SPOC AT UA. THIS DOES NOT INCLUDE SCIENCE DATA PROCESSING SOFTWARE TOOLS, FOR EXAMPLE J-ASTEROID VISUALIZATION SOFTWARE FOR SPOC SCIENCE OPERATIONS. 10. IMPLEMENT THE OTES MISSION ASSURANCE PROGRAM IN ACCORDANCE WITH THE OSIRIS-REX MISSION ASSURANCE REQUIREMENTS (MAR). 11. PROVIDE SYSTEMS ENGINEERING SUPPORT TO MISSION DESIGN AND SPACECRAFT ACCOMMODATIONS. 12. MAINTAIN THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ANY INTERNATIONAL TEAM MEMBERS. 13. POVIDE SUPPORT FOR THE OSIRIS-REX EDUCATION AND PUBLIC OUTREACH (EPO) PROGRAM THAT IS BEING LED BY UNIVERSITY OF ARIZONA AND THE NASA OSIRIS-REX PROJECT OFFICE. 14. EVELOP AND DELIVER THE CONTRACT DATA REQUIREMENTS IDENTIFIED IN THE OSIRIS-REX CONTRACT DATA REQUIREMENTS LIST (CDRL). 15. PRESENT AND PARTICIPATE IN THE OSIRIS-REX MISSION DESIGN REVIEW, THE MISSION LEVEL PRELIMINARY DESIGN REVIEW AND THE MISSION LEVEL CRITICAL DESIGN REVIEW.
Awarding / Funding Agency
NAICS
Not Reported
Pricing
Cost No Fee
Place of Performance
Tempe, AZ 85281 United States
Set Aside
None
Extent Competed
Full And Open Competition
Last Modified: 2/16/16