This project involves the interim and final closure for Refuse Area 8 Stage 1, and the demolition and excavation of Area 9. Work in Area 8 includes but is not limited to, installation of an interim and final cover system using geomembrane or other geosynthetic materials, installation of erosion and sediment controls, installation of landfill gas system components, stormwater ditches, conveyance systems, stripping and subgrade preparation, installation of a contaminated stormwater flap, and all other work in the contract documents. Work in Area 9 includes but is not limited to stockpile removal, soil and underground storage tank removal, demolition of building foundations and structures, sediment and erosion controls, utility and infrastructure removal, installation of conveyance piping, stormwater ditches and controls, installation of seep controls, and all other work in the contract documents.
Background
The Cedar Hills Regional Landfill project is initiated by King County, which aims to manage waste effectively while ensuring environmental safety. The contract focuses on the interim and final closure of Refuse Area 8 Stage 1 and the demolition and excavation of Area 9. The goal is to implement necessary environmental controls and infrastructure improvements at the landfill site.

Work Details
The project involves multiple tasks in both Area 8 and Area 9:

**Area 8 Work Includes:**
- Installation of an interim and final cover system using geomembrane or other geosynthetic materials.
- Installation of erosion and sediment controls.
- Installation of landfill gas system components.
- Construction of stormwater ditches and conveyance systems.
- Stripping and subgrade preparation.
- Installation of a contaminated stormwater flap.

**Area 9 Work Includes:**
- Removal of stockpiles.
- Soil and underground storage tank removal.
- Demolition of building foundations and structures.
- Implementation of sediment and erosion controls.
- Utility and infrastructure removal.
- Installation of conveyance piping, stormwater ditches, seep controls, and other related tasks as specified in the contract documents.

Period of Performance
The contract will be performed over a specified timeframe that aligns with the project milestones, starting from the award date until completion. Specific deadlines for various phases are outlined in the solicitation documents.

Place of Performance
The work will be conducted at the Cedar Hills Regional Landfill located in King County, Washington.

Overview

Opportunity ID
001353,2
Response Start Date
Feb. 25, 2025
Response Deadline
Feb. 28, 2025 Past Due
Date Posted
Feb. 25, 2025
Est. Value Range
Experimental
$5,000,000 - $15,000,000 (AI estimate)
Source
On 2/25/25 King County in Washington issued Cedar Hills Regional Landfill Area 8 Closure Area 9 Demolition and Excavation with ID 001353,2 due 2/28/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Cedar Hills Regional Landfill Area 8 Closure Area 9 Demolition and Excavation

Similar Active Opportunities