Search Contract Opportunities

212-18481-001 Heating Plant Boiler Replacement

ID: A212VSU:87820 • State: Virginia
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

VSU is currently seeking to prequalify contractors to receive as many fully qualified Offerors as possible to bid on the Heating Plant Boiler Replacement. Replacing the existing Water Tube Boiler (Boiler #4) with (2) new 600 Hp 150 psig Fire Tube Steam Boilers. New boilers will be dual fuel (gas & #2 oil) fired and located in the same general area as the existing boiler #4 and the previous location of Boiler #3. The new boilers will be tied into the existing plant steam and condensate distribution systems, including using the existing deaerator and feed water system. New gas and oil piping will be extended from the existing mains. The new boiler flues will discharged vertically through new roof openings. Individual controllers for new boilers will be provided. All new equipment will be integrated into the current Preferred Utility SCADA system for monitoring. The existing condensate receiver (hot well) will be replaced with an in-kind volume (5000 Gallon) Tank and the existing feed water pump controller will be replaced. The new tank will be field fabricated and have the same footprint as the existing tank. The existing vertical turbine transfer pumps serving the hot well will be reused. The existing feed water pumps will be re-used.
Background
Virginia State University (VSU) is seeking to prequalify contractors for the Heating Plant Boiler Replacement project. This project aims to enhance campus safety, security, energy reduction, and system reliability. It involves replacing the existing Water Tube Boiler (Boiler #4) with two new 600 Hp 150 psig Fire Tube Steam Boilers that will be dual fuel (gas & #2 oil) fired. The new boilers will be integrated into the existing steam and condensate distribution systems.

Work Details
The contractor will be responsible for the following tasks:
1. Demolish and remove existing Boiler #4 along with associated piping, electrical systems, and controls.
2. Retain the platform at the rear of Boiler #4 while demolishing all equipment on it.
3. Install two new 150 psig boilers on new or extended boiler pads; rework piping to accommodate new boiler locations.
4. Modify electrical service at MCC as per contract drawings to support new boilers.
5. Extend concrete pad for Boiler #3 and demolish existing pad for Boiler #4 to pour a new pad at the same height as Boiler #3's pad.
6. Provide structural supports for piping from the floor.
7. Retain existing blowdown separator and associated piping and controls.
8. Connect new boilers to the existing SCADA system in the steam plant control room, mapping points as specified in the specifications.

Period of Performance
The project is expected to begin bidding in February 2025 with a total duration of 365 calendar days for completion.

Place of Performance
The work will be performed at Virginia State University located at 21225 University Avenue.

Overview

Opportunity Type
Request for Pre-qualifications (RFPQ)
Opportunity ID
A212VSU:87820
Version
1
Response Deadline
March 18, 2025 Past Due
Date Posted
March 7, 2025
Last Updated
March 7, 2025
Est. Value Range
Experimental
$2,000,000 - $5,000,000 (AI estimate)
Source
On 3/7/25 Virginia State University in Virginia issued Request for Pre-qualifications (RFPQ) Heating Plant Boiler Replacement with ID A212VSU:87820 due 3/18/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for 212-18481-001 Heating Plant Boiler Replacement

Additional Details

Buyer Name
Debra AC Sulla
Full Source ID
IV87820

Similar Active Opportunities