Replacement of Fence at Mustang Bayou Service Area Wastewater Treatment Plant.

ID: 25-043 • State: Texas
Get Real Time Alerts from 40k+ Federal, State and Local Agencies
Find Now

Description

The City of Missouri City, Texas ( City ) is accepting sealed bids from interested companies who can perform the work specified in Invitation For Bid ( IFB ) 25-043 Replacement of Fence at Mustang Bayou Service Area Wastewater Treatment Plant.

Sealed bids must be delivered in accordance with the requirements specified in the above-referenced solicitation by 3 P.M. Central Daylight Time ( CDT ) April 30, 2025 to:

The City of Missouri City, Texas

Attn: City Secretary's Office

Subject: IFB 25-043 (Do Not Open)

1522 Texas Parkway

Missouri City, Texas 77489

Interested companies are highly encouraged (but are not required) to attend a pre-bid conference scheduled for 9 A.M. CDT on March 28, 2025 at the following location:

City Hall Council Chambers (2nd Floor)

City of Missouri City, Texas

1522 Texas Parkway

Missouri City, Texas 77489

The City reserves the right to reject any or all responses, waive informalities, cancel the above solicitation, and make awards that are in the best interest of the City. All costs incurred in the development of a response to this solicitation (directly or indirectly) are the responsibility of the interested party(ies) and not the City.

Background
The City of Missouri City, Texas is issuing this Invitation for Bid (IFB) 25-043 for the replacement of the fence at the Mustang Bayou Service Area Wastewater Treatment Plant. The project aims to enhance security and provide a visual barrier for adjacent properties while removing existing barbed wire fencing. The City seeks to establish a turnkey lump sum contract with a qualified contractor who can provide all necessary resources and services to complete the work as specified.

Work Details
The scope of work includes the following:

1. Replacement of the existing 6-foot chain link fence with an 8-foot tall cedar fence along the north and east property lines.
2. The east property line is approximately 860 linear feet, and the north property line is approximately 230 linear feet, which includes a walkthrough gate.
3. The new fence must connect cleanly to the existing fences on the south and west sides, which are not being replaced.
4. A temporary fence must be installed between the demolition of the old fence and installation of the new one to ensure public safety and facility protection.
5. All materials used must comply with specifications outlined in Exhibit B, including cedar pickets, galvanized steel posts, and gates.

Period of Performance
The contract work is expected to commence upon issuance of a Notice to Proceed (NTP) by the City and must be completed within a timeframe specified in the contractor's bid proposal.

Place of Performance
The work will be performed at Mustang Bayou Wastewater Treatment Plant Facility located at 3650 Trammel Fresno Road, Missouri City, TX 77489.

Overview

Opportunity ID
25-043
Response Deadline
April 30, 2025 Due in 4 Days
Date Posted
March 19, 2025
Est. Value Range
Experimental
$50,000 - $150,000 (AI estimate)
Source
On 3/19/25 City of Missouri City in Texas issued Replacement of Fence at Mustang Bayou Service Area Wastewater Treatment Plant. with ID 25-043 due 4/29/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Replacement of Fence at Mustang Bayou Service Area Wastewater Treatment Plant.

Additional Details

Class Codes
15505-Barriers And Enclosures, Construction;

Similar Active Opportunities