Georgetown County, SC is seeking a qualified firm with experience in marine demolition for the demolition of the Georgetown Port dock and proper disposal of all material. A pre-bid conference & site inspection will take place on Tuesday, September 17, 2024 at 11:00 AM at the Georgetown Port located at 1324 Dock St., Georgetown, SC, 29440. See bid document for full details and bid requirements.
Background
Georgetown County, SC has recently acquired the former South Carolina Ports Authority property located on the Sampit River. A structural evaluation by GEL Engineering, LLC revealed that the existing timber dock has poor structural integrity. This prompted the County's insurance provider to recommend its demolition to mitigate potential liability risks associated with a collapse. The goal of this contract is to safely demolish the dock and ensure proper disposal of all materials.

Work Details
The contractor will be responsible for the following tasks:

1. Remove all existing decking and associated hardware, placing removed materials on uplands or a work barge for disposal.

2. Remove all existing stringers and associated hardware similarly.

3. Detach or cut pile caps from piles, ensuring no contaminants are released into the river during removal.

4. Extract existing timber piles; if extraction is not feasible, cut them at the mudline for removal.

5. Minimize turbidity and sediment disturbance during pile removal.

6. Ensure treated wood piles are not damaged during extraction to prevent contamination release.

7. Transport materials without releasing debris into the aquatic environment.

8. Conduct demolition over-the-water due to the dock's poor condition, which cannot support heavy equipment.

9. Dispose of creosote-treated wood according to local and state regulations at a permitted landfill, with costs borne by the contractor (County Landfill charges $80/ton).

10. Install turbidity curtains or booms in water to contain floating debris and conduct daily housekeeping on-site.

Period of Performance
The contract work is expected to be completed within 120 calendar days from the Notice to Proceed (NTP).

Place of Performance
The work will take place at Georgetown County Port located at 1324 Dock St., Georgetown, SC 29440.

Overview

Pre-Bid Conference
9/17/2024 11:00 AM
Opportunity ID
24-058
Version
1
Response Deadline
Oct. 16, 2024 Past Due
Date Posted
Sept. 10, 2024
Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Source
On 9/10/24 County of Georgetown in South Carolina issued Timber Dock Demolition at Georgetown County Port with ID 24-058 due 10/16/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Timber Dock Demolition at Georgetown County Port

Similar Active Opportunities