Search Contract Opportunities

OER Design Build Solar Car Port, Battery Energy Storage, and EVSE Installation

ID: RFP25005056 • State: Rhode Island
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

RI Office of Energy Resources requests proposals fora Design Build of behind-the-meter solar photovoltaic (PV) carports that incorporate battery energy storage system (BESS) and Electric Vehicle Supply Equipment (EVSE). The project will be installed at the state's parking lot properties (Capitol Hill Campus) surrounding the Powers/Department of Administration (DOA), Cannon/Department of Health (DOH), and Department of Transportation (DOT) buildings in Providence, Rhode Island. Specifically, the parking lots are located between Park St, State St, and Smith St. Prebid: Monday January 27, 2025 @11:00 AM. Lobby Powers Building, One Capitol Hill, Providence, RI 02908
Background
The Rhode Island Office of Energy Resources (OER) is seeking proposals for the design and construction of behind-the-meter solar photovoltaic (PV) carports that will include a battery energy storage system (BESS) and Electric Vehicle Supply Equipment (EVSE).
This initiative aims to enhance renewable energy use and support electric vehicle infrastructure at state-owned parking facilities located on the Capitol Hill Campus in Providence, Rhode Island.
The specific locations for installation are the parking lots surrounding the Powers/Department of Administration (DOA), Cannon/Department of Health (DOH), and Department of Transportation (DOT) buildings, situated between Park St, State St, and Smith St.

Work Details
The contractor will be responsible for the design and construction of solar PV carports that incorporate a battery energy storage system and EVSE.
The project includes:
- Design and engineering of solar PV carports
- Installation of battery energy storage systems
- Installation of Electric Vehicle Supply Equipment
- Compliance with all relevant local, state, and federal regulations
- Coordination with state agencies for site access and installation logistics.
The project is expected to be completed within 12 months from the start date.

Period of Performance
The contract period is anticipated to begin in March 2025, with completion requested within 12 months.
There is an option to renew for one additional 12-month period.

Place of Performance
The work will be performed at the state’s parking lot properties on Capitol Hill Campus in Providence, Rhode Island.

Overview

Opportunity Type
RFP
Opportunity ID
RFP25005056
Version
1
Response Deadline
March 14, 2025 Past Due
Date Posted
Jan. 7, 2025
Est. Value Range
Experimental
$5,000,000 - $15,000,000 (AI estimate)
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the Opportunity ID.
On 1/7/25 State of Rhode Island in Rhode Island issued RFP OER Design Build Solar Car Port, Battery Energy Storage, and EVSE Installation with ID RFP25005056 due 3/14/25.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for OER Design Build Solar Car Port, Battery Energy Storage, and EVSE Installation

Additional Details

Who Can Respond
All Vendors

Similar Active Opportunities