Search Contract Opportunities

Shoreline Stabilization Repair at Baldwin Harbor Park

ID: 2114448 • State: New York

Description

The purpose of the Project is to mitigate erosion and sedimentation caused by inclement weather conditions along the shoreline of Baldwin Park. Mitigation is to be accomplished through the installation of 1500 linear feet of additional gabions to existing gabions, dredging 10.0' seaward of the existing gabion line, and the supplementation to the living shoreline vegetation along Oakwood Canal.

All environmental regulatory permits have been obtained.

The Engineer's Estimate of Probable Construction Cost is $800,000.

Certified Apprenticeship Programs are required for applicable Labor Trades (i.e. Operating Engineers, Heavy Construction Laborers, Dock Builders, etc.)

Service-Disabled Veteran-Owned Set Aside: No

Due date:11/07/2024 11:00 AM

None

Contract term: 60 Calendar Days

County(ies): Nassau

Location: Baldwin Harbor Park

Business entities awarded an identical or substantially similar procurement contract within the past five years:

Available upon request.

Background
The Town of Hempstead, located in Nassau County, New York, is issuing a contract for shoreline stabilization repairs at Baldwin Harbor Park. The purpose of this project is to mitigate erosion and sedimentation caused by inclement weather conditions along the shoreline of Baldwin Park.

The project aims to enhance the environmental integrity of the area and ensure the longevity of the shoreline.

Work Details
The contractor will be responsible for the installation of 1500 linear feet of additional gabions to existing gabions, dredging 10.0 feet seaward of the existing gabion line, and supplementing the living shoreline vegetation along Oakwood Canal.

All necessary environmental regulatory permits have been obtained for this work. The Engineer's Estimate of Probable Construction Cost is $800,000. Certified Apprenticeship Programs are required for applicable labor trades such as Operating Engineers, Heavy Construction Laborers, and Dock Builders.

Period of Performance
The contract term is set for 60 calendar days from the start date.

Place of Performance
The work will be performed at Baldwin Harbor Park, located in Baldwin, New York.

Overview

Opportunity Type
General
Opportunity ID
2114448
Response Deadline
Nov. 7, 2024 Past Due
Date Posted
Oct. 11, 2024
Est. Value Range
Experimental
$800,000 (Agency Estimate)
Source
Source Notes
Must be signed in to the New York Contract Reporter to view the opportunity.
On 10/11/24 North Hempstead, Town of in New York issued General Shoreline Stabilization Repair at Baldwin Harbor Park with ID 2114448 due 11/7/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Shoreline Stabilization Repair at Baldwin Harbor Park

Classifications

Similar Active Opportunities