Dishwasher Modifications at Student Union Building, Terrace Restaurant & Element 93
SUNY Project No. 25:01P
- Project Description:
The work to be done under the Contract, in accordance with the Contract Documents, consists of performing, installing, furnishing and supplying all materials, equipment, labor, and incidentals necessary or convenient for the construction of Project Number 25:01P, titled Dishwasher Modifications at Student Union Building, Terrace Restaurant, and Element 93 and carry out all duties and obligations imposed upon the contractor by the Contract Documents to support the new kitchen renovations which involves some Hazmat, Architectural, Plumbing and Electrical systems modifications and see below for details.
The main features of the work shall include, but not be limited to the following:
Mechanical/Plumbing Scope:
Student Union
Removals: Disconnect existing dishwasher and sink indirect connection to existing floor drain including removal of existing floor drain along with removal of existing 3/4HW and CW to dishwasher and sink. Work also includes removal of existing ductwork/hood over existing dishwasher.
New Work: Provide new floor sink along with drain piping from dishwasher to floor sink and new HW and CW piping from existing riser taps to dishwasher. Works also includes new duct connection from dishwasher to existing ductwork directly above dishwasher.
Terrace:
Removals: Disconnect existing dishwasher from existing domestic water piping and indirect Sanitary connection to existing floor sink.
New Work: Provide new drain piping from dishwasher to existing floor sink and reconnect into existing HW and CW piping. Work also includes connection of adaptor exhaust hood into existing hood to allow extension of coverage over dishwasher.
Wooster Caf :
Removals: Disconnect existing dishwasher from existing domestic water piping and indirect Sanitary connection to existing floor sink.
New Work: Provide new drain piping from dishwasher to existing floor sink and reconnect into existing HW and CW piping.
General Note:
Coordinate all removals of existing dishwasher and other equipment noted on the drawings work with the college and campus auxiliary services before any work begins.
- Supplemental Scope
- Contractor shall be fully responsible to review all existing conditions, all dimensions, all material quantities necessary, and all new work indicated or shown; and as fully coordinated with all construction documents and specifications prior to bidding.
- Provide all tools, equipment, demolition, labor, supervision, project coordination, legal removals, and legal recycling, disposal, and reporting of all construction waste of the work.
All work shall be completed in accordance with applicable manufacturer's materials standards; applicable NYSDOT Standards, NY State Building Code requirements, and applicable Federal & State regulations (see Section C.34 Code Requirements for additional requirements).
- Work Not Included:
Work not included in the work of the Contract are those items marked N.I.C; movable furnishings, except those specifically specified or indicated on the Drawings; and items marked by others.
Work not included in the work of the Contract shall be coordinated with the college, and shall include the work listed below, but not be limited to the following:
- Any direct work associated with other projects by the College or by other Contractors near the work areas, but Contractor for this project shall coordinate their work as necessary.
- Project Schedule:
- The project shall commence upon award of contract, but actual construction shall be completed between June 1, 2025 and August 1, 2025. An additional 30 days will be added beyond the construction work period to allow for administrative paperwork, such applications for payment and closeout materials.
- Time is of the essence. Work shall commence immediately upon execution of Owner/Contractor Agreement and shall progress to substantial completion as stated above and as per the Contract Agreement Article III Time of Performance Section 3.01 Commencement, Prosecution and Completion of Work.
- With their Bid Documents, Contractor shall submit a preliminary construction schedule to the College indicating how they can complete the work by the substantial completion dates stated above. Benchmark dates for major parts of the work as referenced with the specifications shall be listed in the schedule. Reference Section 22 CPM Schedule for further information.
- The Contractor shall employ sufficient trained, skilled work crews and provide adequate equipment and work crews as necessary to comply with the Project Schedule and complete the Work during this construction period.
- Alternates:
No Alternates.
Service-Disabled Veteran-Owned Set Aside: No
Minority Owned Sub-Contracting Goal: 0%
Women Owned Sub-Contracting Goal: 0%
Service-Disabled Veteran-Owned Business Contracting Goal: 0%
Due date:04/17/2025 2:00 PM
Contract term: Single Occurrence
County(ies): All NYS counties
Location: SUNY New Paltz
Business entities awarded an identical or substantially similar procurement contract within the past five years:
N/A
Background
The State University of New York at New Paltz is issuing a contract for plumbing modifications related to dishwasher installations at the Student Union Building, Terrace Restaurant, and Element 93. The project, designated as SUNY Project No. 25:01P, aims to support new kitchen renovations that involve modifications to various systems including Hazmat, Architectural, Plumbing, and Electrical.
Work Details
The contractor will be responsible for performing, installing, furnishing, and supplying all materials, equipment, labor, and incidentals necessary for the construction of the project. The work includes:
- **Student Union**: Disconnecting existing dishwasher and sink connections to the floor drain; removing existing ductwork/hood; providing a new floor sink with drain piping from the dishwasher; installing new hot water (HW) and cold water (CW) piping from existing riser taps to the dishwasher; connecting new ductwork from the dishwasher to existing ductwork above.
- **Terrace Restaurant**: Disconnecting existing dishwasher from domestic water piping; providing new drain piping from the dishwasher to an existing floor sink; reconnecting into existing HW and CW piping; connecting an adaptor exhaust hood into the existing hood.
- **Wooster Café**: Disconnecting existing dishwasher from domestic water piping; providing new drain piping from the dishwasher to an existing floor sink; reconnecting into existing HW and CW piping.
General coordination with college services is required before any removals begin. The contractor must also review all conditions and dimensions prior to bidding.
Period of Performance
The project is scheduled to commence upon contract award with actual construction expected to be completed between June 1, 2025, and August 1, 2025. An additional 30 days will be allocated for administrative paperwork following construction completion.
Place of Performance
The work will take place at the State University of New York at New Paltz located at 1 Hawk Drive, New Paltz, NY 12561.