Search Contract Opportunities

SM1675180 - Replacement of Bridge No. 1800700 on MD 5 over Hilton Run

ID: BPM043693 • State: Maryland

Description

Replacement of Bridge No. 1800700 on MD 5 over Hilton Run. The existing bridge is a single span steel beam bridge 31'-9 (+/-) long and 33'-1 (+/-) wide. The new bridge is a single span steel girder bridge, 40'-0 long and 43'-8 1 2 wide, with 40'-8 of clear roadway. The proposed typical section includes two 12'-0 lanes and shoulder widths that vary between 8'-0 and 8'-8 . The proposed bridge will be founded on steel H-piles. The project also includes the reconstruction and paving of 1,055 feet of MD 5; construction of a new stormwater management facility; placement of traffic barriers, signing, and pavement markings; removal of the existing bridge; and final landscaping of the project site. A minimum of one lane of traffic will be maintained on the bridge during construction using a system of temporary traffic signals. There is no incentive/disincentive clause for this project.
Background
The State of Maryland Department of Transportation, State Highway Administration (SHA) has issued a solicitation for the Replacement of Bridge No. 1800700 on MD 5 over Hilton Run. The project aims to replace the existing bridge with a new single span steel girder bridge, widen the roadway, reconstruct and pave a section of MD 5, construct a stormwater management facility, place traffic barriers and signage, remove the existing bridge, and complete final landscaping.
The project also includes maintaining at least one lane of traffic on the bridge during construction using temporary traffic signals.

Work Details
The work includes the replacement of Bridge No. 1800700 on MD 5 over Hilton Run. The existing bridge is a single span steel beam bridge 31’-9” (+/-) long and 33’-1” (+/-) wide. The new bridge is a single span steel girder bridge, 40’-0” long and 43’-8 ½” wide, with 40’-8” of clear roadway. The proposed typical section includes two 12’-0” lanes and shoulder widths that vary between 8’-0” and 8’-8”. The proposed bridge will be founded on steel H-piles.
Additionally, the project involves the reconstruction and paving of 1,055 feet of MD 5; construction of a new stormwater management facility; placement of traffic barriers, signing, and pavement markings; removal of the existing bridge; and final landscaping of the project site.

Period of Performance
The bid opening for this project is scheduled for May 23, 2024.

Place of Performance
The project will be performed in Saint Mary’s County, Maryland.

Overview

Opportunity Type
Public Notice
Opportunity ID
BPM043693
Version
1
Response Deadline
June 20, 2024 Past Due
Date Posted
April 16, 2024
Source
On 4/16/24 State Highway Administration in Maryland issued Public Notice SM1675180 - Replacement of Bridge No. 1800700 on MD 5 over Hilton Run with ID BPM043693 due 6/20/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for SM1675180 - Replacement of Bridge No. 1800700 on MD 5 over Hilton Run

Additional Details

Additional Instructions
ONLINE ELECTRONIC BIDS for the project(s) listed below will be received by the State Highway Administration (SHA) at https://www.bidx.com/maryland/main until 12 Noon Eastern time on the date specified below for the Bid Opening, at which time they will be opened.
Alternate ID
SM1675180
Lot #
1
Round #
3

Similar Active Opportunities