Search Contract Opportunities

24-022 Low Water Drain Cipp Rehabilitation Murphey Candler Lake Dam

ID: 64496 BROOKHAVEN, PE-64496-NONST-2025-000000030 • State: Georgia
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

The City of Brookhaven is soliciting competitive sealed bids from qualified contractors for a cured-in-place pipe (CIPP) rehabilitation of the corrugated metal pipe (CMP) Low Water Drain (LWD) at Murphey Candler Lake Dam for the Department of Public Works. Work will be done in accordance with the Contract Documents: Agreement, Drawings (100% Construction Plan for: Murphey Candler Lake Park Dam CMP Spillway and Riser Repair, Permit #MS23-00094, dated February 15, 2024), Special Technical Specifications (Specifications for Murphey Candler Dam CIPP Rehabilitation for City of Brookhaven, February 2024), Special Details, City of Brookhaven Standard Details, Georgia Department of Transportation s Standard Drawings, Standard Specifications, and Pay Items Index as the standards for the construction and completion of the work required, except as noted or directed by Engineer.
Background
The City of Brookhaven is issuing this solicitation for competitive sealed bids from qualified contractors for the rehabilitation of the Low Water Drain (LWD) at Murphey Candler Lake Dam. This project is part of the Department of Public Works' efforts to maintain infrastructure and ensure safety standards. The work will adhere to various contract documents, including construction plans and specifications set forth by the City and Georgia Department of Transportation.

Work Details
The contractor will provide all labor, materials, equipment, and services necessary for the cured-in-place pipe (CIPP) rehabilitation of the corrugated metal pipe (CMP) Low Water Drain at Murphey Candler Lake Dam. The scope includes:

- Dewatering of the work area for the duration of the project.
- Implementation of erosion and sediment control practices.
- Maintenance activities around the spillway as outlined in additional construction documents.
- Conducting an Aerial LiDAR survey of the dewatered lakebed to provide volumetric information.
- Compliance with Georgia Department of Transportation Standard Specifications throughout all phases of work.

Period of Performance
The contract duration is 240 calendar days from the issuance of the Notice to Proceed, with substantial completion expected within 150 calendar days. Refilling of the reservoir will occur over a period not exceeding 90 calendar days following substantial completion.

Place of Performance
The work will be performed at Murphey Candler Lake Dam, located in Brookhaven, Georgia.

Overview

Opportunity Type
Non-State Agency
Opportunity ID
64496 BROOKHAVEN, PE-64496-NONST-2025-000000030
Version
1
Response Deadline
Nov. 22, 2024 Past Due
Date Posted
Oct. 17, 2024
Est. Value Range
Experimental
$500,000 - $1,500,000 (AI estimate)
Source
On 10/17/24 BROOKHAVEN, CITY OF in Georgia issued Non-State Agency Low Water Drain CIPP Rehabilitation at Murphey Candler Lake Dam with ID 64496 BROOKHAVEN, PE-64496-NONST-2025-000000030 due 11/22/24.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for 24-022 Low Water Drain Cipp Rehabilitation Murphey Candler Lake Dam

Additional Details

Agency Site
Purchase Type
Non-State Agency

Similar Active Opportunities