11/1/2024 - Addendum No.1: additional site walk set for November 4, 2024. Youth Health and Wellness Center The Scope of Work: Tenant improvement to ground floor of an existing three-story concrete building constructed in 1920. The building underwent a seismic and building systems upgrade in 2021. Project is a homeless youth health and wellness center providing services to occupants of the shelter occupying the upper two floors of the building as well as unsheltered youth. Buildout occurs in the unoccupied ground floor of the building which includes 8,465 sf of interior space and 1,747 sf of exterior space. Work includes interior TI, distribution of mechanical ducting throughout the TI; existing AHU to be used; new exhaust fans to be installed, new water heater and plumbing fixtures; new Fire Sprinkler and Fire Alarm upgrades; new lighting, electrical and low voltage distribution. New equipment and appliances are electrical. There will be no structural work. Demolition is minor and includes some slab and storefront demolition. The time allowed for completion is 160 consecutive calendar days. The estimated construction cost is approximately $3,500,000. Quotes in excess of $1,000,000 may not be awarded through this informal bidding process. A pre-bid meeting and site walk will be held on Wednesday, October 30, 2024 at 10:00 am at the project site located at 888 Post Street, San Francisco, CA 94103. Class "B" license is required to bid. 1. DPWs Contracts & Bid Opportunities, https://bidopportunities.apps.sfdpw.org/: to obtain Advertisements, Tabulation of Bids, and Awards information. 2. DPW Electronic Bid Documents Download Site, https://bsm.sfdpw.org/ContractAdmin/Login.aspx to obtain Bid Documents, Plan Holders Lists and Addendum information; may be downloaded at no cost. 3. OLSE, http://sfgsa.org/index.aspx?page=391: Office of Labor Standards Enforcement (OLSE) website to obtain documents distributed at the pre-bid conference and other information. Documents include: -Healthcare Security Ordinance -Pre-bid and pre-construction information -Paid Sick Leave Ordinance Fact Sheet Effective March 1, 2015, no contractor or subcontractor may be listed in a bid for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. DISCLAIMER: The information provided below is a summary of the project. Addenda and other bid changes will be distributed by email only to Plan Holders with email addresses, and will be posted on the DPW Electronic Bid Documents Download Site. DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.
Background
The City and County of San Francisco, through its Department of Public Works (DPW), is issuing a solicitation for the Youth Health and Wellness Center project. This project aims to provide a health and wellness center for homeless youth, serving both the occupants of the shelter on the upper floors and unsheltered youth.
The building, constructed in 1920, has undergone seismic upgrades and building system improvements in 2021.
Work Details
The scope of work involves tenant improvements to the ground floor of an existing three-story concrete building. The buildout will cover 8,465 square feet of interior space and 1,747 square feet of exterior space. Specific tasks include:
- Interior tenant improvements (TI)
- Distribution of mechanical ducting throughout the TI
- Utilization of existing Air Handling Unit (AHU)
- Installation of new exhaust fans
- Installation of a new water heater and plumbing fixtures
- Upgrades to fire sprinkler and fire alarm systems
- New lighting, electrical systems, and low voltage distribution
- Installation of new electrical equipment and appliances
- Minor demolition work including some slab and storefront demolition. No structural work is required.
The estimated construction cost is approximately $3,500,000.
Period of Performance
The time allowed for completion is 160 consecutive calendar days from the start date.
Place of Performance
The contract will be performed at 888 Post Street, San Francisco, CA 94103.