Search Documents
Statement of Work FOXBOX.pdf
Posted: May 3, 2024
• Type: .pdf
• Size: 0.09MB
Submit Questions to Government Officer Anonymously
Place your question(s) below. One of our analysts will anonymously submit the question(s) within 8 hours and provide any responses via email once received.
Question & Answer Assistant
Hello! Please let me know your question about this document. I will answer based on the related documents for this opportunity.
Some suggestions:
I'd like to anonymously submit a question to the procurement officer(s)
Loading
Overview
Related Opportunity
Related Agency
Summary
Statement of work (SOW) for the acquisition of parts for 2 copies of the initial prototype 3U VPX Fox Box and associated equipment by AFWERX. The project aims to demonstrate mandated MOSA (Modular Open Source Architecture) edge compute capabilities on all variants of the F-35, with the objective of delivering test, training, and combat capabilities in relevant timelines to the warfighter via establishing government-controlled residency onboard fielded weapons systems.
The scope of work includes the procurement of specific parts such as SBC 3UVPX card, GPU 3UVPX card, switch 3UVPX card, 1394 XMC mezzanine card, and DAP FireSpy430BT, each with detailed technical requirements. The contractor is responsible for sourcing, manufacturing, inspecting, packaging, and delivering the parts to the specified standards outlined in the SOW. The agency will provide necessary documentation, access to facilities, and technical assistance as required to facilitate the procurement process.
Quality assurance procedures must be adhered to by the contractor to ensure that all parts meet specified requirements and standards. The delivery and acceptance process, terms and conditions of the contract, performance metrics and reporting requirements are also outlined in the document.
The scope of work includes the procurement of specific parts such as SBC 3UVPX card, GPU 3UVPX card, switch 3UVPX card, 1394 XMC mezzanine card, and DAP FireSpy430BT, each with detailed technical requirements. The contractor is responsible for sourcing, manufacturing, inspecting, packaging, and delivering the parts to the specified standards outlined in the SOW. The agency will provide necessary documentation, access to facilities, and technical assistance as required to facilitate the procurement process.
Quality assurance procedures must be adhered to by the contractor to ensure that all parts meet specified requirements and standards. The delivery and acceptance process, terms and conditions of the contract, performance metrics and reporting requirements are also outlined in the document.
Show All