Search Documents

SOW IDIQ for SAP DRAFT.pdf

Posted: Nov. 30, 2023 • Type: .pdf • Size: 1.35MB

Overview

Summary
Statement of Work (SOW) for a general construction contract, specifically an Indefinite Delivery Indefinite Quantity (IDIQ) contract for the Southeast Sunbelt region, issued by the Public Buildings Service of the United States General Services Administration (GSA). The purpose of this contract is to obtain construction services for agency-requested space modifications, including selective demolition, installation of partitions, doors, ceilings, light fixtures, fire sprinklers, and coordination of building systems. The general construction contractor is required to provide all labor, materials, and equipment to fulfill the scope of work. The project goals include expediting the project using a general construction project delivery method. The document outlines specific requirements for contract parties, professional ethics and standards of practice, project delivery team roles and responsibilities, owner's project requirements, budgeting, schedule management, and performance objectives. Additionally, it specifies reference materials such as AutoCAD files and design intent drawings that must be complied with during the construction process.

The GSA will act as the contracting office representing the United States government in this contract. The general construction contractor is expected to adhere to ethical principles and professional standards of practice in the construction industry and work in collaboration with the project delivery team. The document also emphasizes compliance with federal contracting principles and regulations. Furthermore, it details specific requirements for the general construction contractor's team composition and qualifications. Additionally, it outlines performance objectives related to standards and criteria documents that must be followed throughout the contract.

This SOW provides comprehensive details on the project's scope, requirements for awarding the contract, submission procedures, and specific responsibilities for both the government agency and the contractor.

Document Preview