W9123817C0025
Definitive Contract
Overview
Government Description
IGF::CT::IGF
ISABELLA DAM SAFETY MODIFICATION PROJECT (DSMP), PHASE II DAMS AND SPILLWAY, LAKE ISABELLA, CA. TOTAL AMOUNT OF THE BASE CONTRACT WHEN FULLY FUNDED WILL BE $204,096,020.00
Alternate Description
Isabella Lake Dam Safety Modification Project
Awarding / Funding Agency
Place of Performance
Lake Isabella, CA 93240 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Related Opportunity
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 03/29/21 to 03/26/24 and the Potential Award value has increased 33% from $253,671,962 to $337,304,699.
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Flatiron-Dragados-Sukut Joint Venture was awarded
Definitive Contract W9123817C0025 (W91238-17-C-0025)
worth up to $337,304,699
by USACE Sacramento District
in September 2017.
The contract
has a duration of 6 years 6 months and
was awarded
through solicitation Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway, Lake Isabella, CA
full & open
with
NAICS 237990 and
PSC Y1KA
via direct negotiation acquisition procedures with 6 bids received.
DOD Announcements
Sep 2017:
Flatiron/Dragados/Sukut JV, Benicia, California, has been awarded a $204,096,020 firm-fixed-price contract for modifications of the Isabella Dam and spillway which includes raising the main dam, auxiliary dam and main dam control tower and reconstructing the spillway. Bids were solicited via the Internet with six received. Work will be performed in Lake Isabella, California, with an estimated completion date of March 29, 2021. Fiscal 2017 civil works funds in the amount of $81,500,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Sacramento, California, is the contracting activity (W91238-17-C-0025).
Sep 2018: Flatiron/Dragados/Sukut JV, Benicia, California, was awarded a $36,695,695 modification (P00006) to contract W91238-17-C-0025 for the auxiliary spillway for the Isabella Lake Dam safety modification project and the demolition of several downstream monoliths in the Borel Outlet Works through the auxiliary dam, filling the Borel Outlet Works conduit through the auxiliary dam with lightweight concrete, and overall modifications to the auxiliary spillway. Work will be performed in Lake Isabella, California, with an estimated completion date of July 1, 2021. Fiscal 2018 civil works funds in the amount of $36,695,695 were obligated at the time of the award. U.S. Army Corps of Engineers, Sacramento, California, is the contracting activity.
Aug 2023: Flatiron-Dragados-Sukut JV, Concord, California, was awarded an $11,550,000 modification (P00068) to contract W91238-17-C-0025 for the Isabella Lake Dam Safety Modification Project. Work will be performed in Lake Isabella, California, with an estimated completion date of Aug. 31, 2023. Fiscal 2018 civil construction funds in the amount of $11,550,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Sacramento, California, is the contracting activity.
Sep 2018: Flatiron/Dragados/Sukut JV, Benicia, California, was awarded a $36,695,695 modification (P00006) to contract W91238-17-C-0025 for the auxiliary spillway for the Isabella Lake Dam safety modification project and the demolition of several downstream monoliths in the Borel Outlet Works through the auxiliary dam, filling the Borel Outlet Works conduit through the auxiliary dam with lightweight concrete, and overall modifications to the auxiliary spillway. Work will be performed in Lake Isabella, California, with an estimated completion date of July 1, 2021. Fiscal 2018 civil works funds in the amount of $36,695,695 were obligated at the time of the award. U.S. Army Corps of Engineers, Sacramento, California, is the contracting activity.
Aug 2023: Flatiron-Dragados-Sukut JV, Concord, California, was awarded an $11,550,000 modification (P00068) to contract W91238-17-C-0025 for the Isabella Lake Dam Safety Modification Project. Work will be performed in Lake Isabella, California, with an estimated completion date of Aug. 31, 2023. Fiscal 2018 civil construction funds in the amount of $11,550,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Sacramento, California, is the contracting activity.
Status
(Complete)
Last Modified 6/11/24
Period of Performance
9/14/17
Start Date
3/26/24
Current End Date
3/26/24
Potential End Date
Obligations
$337.3M
Total Obligated
$337.3M
Current Award
$337.3M
Potential Award
Award Hierarchy
Definitive Contract
W9123817C0025
Subcontracts
Activity Timeline
Subcontract Awards
Disclosed subcontracts for W9123817C0025
Opportunity Lifecycle
Procurement history for W9123817C0025
Transaction History
Modifications to W9123817C0025
People
Suggested agency contacts for W9123817C0025
Competition
Number of Bidders
6
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Defense Program
None
DoD Claimant Code
Construction
IT Commercial Item Category
Not Applicable
Awardee UEI
MRL6KMXKCTD5
Awardee CAGE
7W5X4
Agency Detail
Awarding Office
W91238 W075 ENDIST SACRAMENTO
Funding Office
W91238
Created By
floyd.bolton@usace.army.mil
Last Modified By
floyd.bolton@usace.army.mil
Approved By
floyd.bolton@usace.army.mil
Legislative
Legislative Mandates
Construction Wage Rate Requirements
Performance District
CA-20
Senators
Dianne Feinstein
Alejandro Padilla
Alejandro Padilla
Representative
Kevin McCarthy
Modified: 6/11/24