N4008521C0077
Definitive Contract
Overview
Government Description
P-381 MULTI-MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD, KITTERY, ME
Awardee
Awarding / Funding Agency
Place of Performance
Kittery, ME 3904 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Related Opportunity
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 06/01/28 to 08/17/28 and the Potential Award value has increased 9% from $1,739,899,555 to $1,892,535,498.
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of Defense has an overall small business subcontracting goal of 30%
381 Constructors was awarded
Definitive Contract N4008521C0077 (N40085-21-C-0077)
for P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard, Kittery, Me
worth up to $1,892,535,498
by Naval Facilities Engineering Command
in August 2021.
The contract
has a duration of 7 years and
was awarded
through solicitation P-381 MULTI-MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY MAINE
full & open
with
NAICS 237990 and
PSC Y1ED
via direct negotiation acquisition procedures with 2 bids received.
As of today, the Definitive Contract has a total reported backlog of $512,817,021 and funded backlog of $508,208,909.
DOD Announcements
Aug 2021:
381 Constructors, Omaha, Nebraska, is awarded a $1,731,477,644 firm-fixed-price contract for construction of a multi-mission dry dock at Portsmouth Naval Shipyard, Maine. The contract is incrementally funded with the first increment of $70,000,000 being allocated at the time of award. The second increment will be funded in fiscal 2022 at $214,000,000. The third increment will be funded in fiscal 2023 at $390,000,000. The fourth increment will be funded in fiscal 2024 at $405,000,000. The fifth increment will be funded in fiscal 2025 at $300,000,000. The sixth increment will be funded in fiscal 2026 at $200,000,000. The seventh increment will be funded in fiscal 2027 at $152,477,644. The contract also contains seven unexercised options which, if exercised, would increase cumulative contract value to $1,739,899,555. Work will be performed in Kittery, Maine, and is expected to be completed by June 2028. This project constructs a partitioned addition to Dry Dock #1 within the superflood basin area. The addition will consist of two bays, labeled Dry Dock #1 North and Dry Dock #1 West. The existing Dry Dock #1 will be renamed Dry Dock #1 East. Both Dry Dock #1 North and Dry Dock #1 West will be of sufficient size and depth to support the maintenance and overhaul of Virginia-class submarines, Blocks I-IV. New construction will include concrete floors, walls, and center wall separating Dry Dock #1 North and Dry Dock #1 West, new pump well systems, pump station building, two caissons, portal crane rails, mooring hardware, mechanical and electrical utilities, utility tunnels, and all appurtenances required to ensure an operational dry dock. Modifications will be made to the existing basin closure wall and to Berths #1 and #11. The existing Dry Dock #1 pumpwell will be connected to the new pumpwell system and the interior will be modified. The facility will include basic telephone, computer network, fiber optic, closed-circuit television security system, utility metering, and fire alarm systems. Fiscal 2021 military construction, (Navy) contract funds in the amount of $70,000,000 are obligated on this award and will not expire at the end of the current fiscal year. This contract was solicited via the beta.sam.gov website with two non-price proposals received. The Naval Facilities Engineering Systems Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-21-C-0077).
Oct 2022: 381 Constructors, Omaha, Nebraska, is awarded a $14,532,579 modification to previously awarded firm-fixed-price contract N40085-21-C-0077 for P381 Multi-Mission Dry Dock #1 Extension at Portsmouth Naval Shipyard, Maine. This award brings the total cumulative contract value to $1,838,390,963. The contract modification is for the provision and operation of a bubble curtain system to protect marine mammals during in-water construction activities. Work will be performed in Kittery, Maine, and is expected to be completed by June 2028. Fiscal 2022 military construction (Navy) funds in the amount of $3,870,818 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Facilities Engineering Systems Command Atlantic, Officer in Charge of Construction Portsmouth Naval Shipyard, Kittery, Maine, is the contracting activity.
Feb 2023: 381 Constructors, Omaha, Nebraska, is awarded a $34,000,000 modification to previously awarded firm-fixed-price contract N40085-21-C-0077 for work at Multi-Mission Dry Dock 1 at the Portsmouth Naval Shipyard, Kittery, Maine. This award brings the total cumulative face value of the contract to $1,872,713,779. The contract modification is for removal of additional bedrock; removal of exfiltration measures; a change from secant to tangent pile construction, and project phasing changes to support post award delays and updated fleet schedules. Work will be performed in Kittery, Maine and is expected to be complete by June 2028. Fiscal 2022 military construction (Navy) funds in the amount of $3,700,000; and fiscal 2023 military construction (Navy) funds in the amount of $12,800,000 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Facilities Engineering Systems Command Atlantic, Officer in Charge of Construction, Portsmouth Naval Shipyard, Kittery, Maine, is the contracting activity (N40085-21-C-0077).
Feb 2023: 381 Constructors, Omaha, Nebraska, is awarded a $34,000,000 modification to previously awarded firm-fixed-price contract N40085-21-C-0077 for work at Multi-Mission Dry Dock 1 at the Portsmouth Naval Shipyard, Kittery, Maine. This award brings the total cumulative face value of the contract to $1,872,713,779. The contract modification is for removal of additional bedrock; removal of exfiltration measures; a change from secant to tangent pile construction, and project phasing changes to support post award delays and updated fleet schedules. Work will be performed in Kittery, Maine and is expected to be complete by June 2028. Fiscal 2022 military construction (Navy) funds in the amount of $3,700,000; and fiscal 2023 military construction (Navy) funds in the amount of $12,800,000 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Facilities Engineering Systems Command Atlantic, Officer in Charge of Construction, Portsmouth Naval Shipyard, Kittery, Maine, is the contracting activity (N40085-21-C-0077).
Oct 2022: 381 Constructors, Omaha, Nebraska, is awarded a $14,532,579 modification to previously awarded firm-fixed-price contract N40085-21-C-0077 for P381 Multi-Mission Dry Dock #1 Extension at Portsmouth Naval Shipyard, Maine. This award brings the total cumulative contract value to $1,838,390,963. The contract modification is for the provision and operation of a bubble curtain system to protect marine mammals during in-water construction activities. Work will be performed in Kittery, Maine, and is expected to be completed by June 2028. Fiscal 2022 military construction (Navy) funds in the amount of $3,870,818 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Facilities Engineering Systems Command Atlantic, Officer in Charge of Construction Portsmouth Naval Shipyard, Kittery, Maine, is the contracting activity.
Feb 2023: 381 Constructors, Omaha, Nebraska, is awarded a $34,000,000 modification to previously awarded firm-fixed-price contract N40085-21-C-0077 for work at Multi-Mission Dry Dock 1 at the Portsmouth Naval Shipyard, Kittery, Maine. This award brings the total cumulative face value of the contract to $1,872,713,779. The contract modification is for removal of additional bedrock; removal of exfiltration measures; a change from secant to tangent pile construction, and project phasing changes to support post award delays and updated fleet schedules. Work will be performed in Kittery, Maine and is expected to be complete by June 2028. Fiscal 2022 military construction (Navy) funds in the amount of $3,700,000; and fiscal 2023 military construction (Navy) funds in the amount of $12,800,000 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Facilities Engineering Systems Command Atlantic, Officer in Charge of Construction, Portsmouth Naval Shipyard, Kittery, Maine, is the contracting activity (N40085-21-C-0077).
Feb 2023: 381 Constructors, Omaha, Nebraska, is awarded a $34,000,000 modification to previously awarded firm-fixed-price contract N40085-21-C-0077 for work at Multi-Mission Dry Dock 1 at the Portsmouth Naval Shipyard, Kittery, Maine. This award brings the total cumulative face value of the contract to $1,872,713,779. The contract modification is for removal of additional bedrock; removal of exfiltration measures; a change from secant to tangent pile construction, and project phasing changes to support post award delays and updated fleet schedules. Work will be performed in Kittery, Maine and is expected to be complete by June 2028. Fiscal 2022 military construction (Navy) funds in the amount of $3,700,000; and fiscal 2023 military construction (Navy) funds in the amount of $12,800,000 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Facilities Engineering Systems Command Atlantic, Officer in Charge of Construction, Portsmouth Naval Shipyard, Kittery, Maine, is the contracting activity (N40085-21-C-0077).
Status
(Open)
Last Modified 9/24/24
Period of Performance
8/13/21
Start Date
8/17/28
Current End Date
8/17/28
Potential End Date
Obligations and Backlog
$1.4B
Total Obligated
$1.9B
Current Award
$1.9B
Potential Award
$508.2M
Funded Backlog
$512.8M
Total Backlog
Award Hierarchy
Definitive Contract
N4008521C0077
Subcontracts
Activity Timeline
Subcontract Awards
Disclosed subcontracts for N4008521C0077
Opportunity Lifecycle
Procurement history for N4008521C0077
Transaction History
Modifications to N4008521C0077
People
Suggested agency contacts for N4008521C0077
Competition
Number of Bidders
2
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Defense Program
None
DoD Claimant Code
Construction
IT Commercial Item Category
Not Applicable
Awardee UEI
P4LGE35HG4B5
Awardee CAGE
8QYU2
Agency Detail
Awarding Office
N62470 NAVFACSYSCOM ATLANTIC
Funding Office
N62470
Created By
bruce.w.davis@navy.mil
Last Modified By
brady.c.hammond@navy.mil
Approved By
brady.c.hammond@navy.mil
Legislative
Legislative Mandates
Construction Wage Rate Requirements
Performance District
ME-01
Senators
Susan Collins
Angus King
Angus King
Representative
Chellie Pingree
Modified: 9/24/24