GOGA 222626 Rehabilitate Torpedo Wharf Phase I
Golden Gate National Recreation Area, San Fransico, California.
This project is Phase I of a larger project that will rehabilitate the deteriorated superstructure (piles, pile caps and structural deck) and surface pavement and includes rehabilitating the existing fendering and bullrails; adding new safety railings and rescue ladders; and installing reinforcement and protective coating to the under deck of the trestle/approach/wharf for Torpedo Wharf, located at Crissy Field, Golden Gate National Recreation Area. The structure is of an historic nature.
ifornia.
The work of Phase I (this project) includes concrete underdeck rehabilitation to the deck and pile cabs between the shore and eighth abutment; removal of existing asphalt surface for the entire wharf; rehabilitation of the concrete top deck and curb for the entire wharf; replacement of the approach trestle construction joints; replacement of the wharf bullrail; installation of guardrailing and ladders; resurfacing of the deck of the entire wharf; and site restoration as necessary.
Background
The project is Phase I of a larger project that will rehabilitate the deteriorated superstructure (piles, pile caps and structural deck) and surface pavement and includes rehabilitating the existing fendering and bullrails; adding new safety railings and rescue ladders; and installing reinforcement and protective coating to the under deck of the trestle/approach/wharf for Torpedo Wharf, located at Crissy Field, Golden Gate National Recreation Area. The structure is of an historic nature.

Work Details
The work of Phase I (this project) includes concrete underdeck rehabilitation to the deck and pile cabs between the shore and eighth abutment; removal of existing asphalt surface for the entire wharf; rehabilitation of the concrete top deck and curb for the entire wharf; replacement of the approach trestle construction joints; replacement of the wharf bullrail; installation of guardrailing and ladders; resurfacing of the deck of the entire wharf; and site restoration as necessary.

Period of Performance
The anticipated period of performance is 240 calendar days including any potential weather shutdown. There are seasonal/other shutdowns mandated through the construction season. Winter construction may be required.

Place of Performance
The project is located at Golden Gate National Recreation Area, San Francisco, California. The surrounding area is urban with limited staging located adjacent to the project site. The construction site is within one (1) mile from nearest suppliers and lodging facilities.

Overview

Response Deadline
July 16, 2024, 2:00 p.m. EDT Past Due
Posted
July 2, 2024, 9:30 a.m. EDT
Set Aside
None
Place of Performance
San Francisco, CA 222626 USA
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Low
Est. Value Range
Experimental
$5,000,000 - $10,000,000 (AI estimate)
Odds of Award
63%
On 7/2/24 Denver Service Center issued Sources Sought 140P2024R0162 for GOGA 222626 Rehabilitate Torpedo Wharf Phase I due 7/16/24. The opportunity was issued full & open with NAICS 237990 and PSC Z2PZ.
Primary Contact
Name
Tollensdorf, Brian   Profile
Phone
(303) 969-2228

Documents

Posted documents for Sources Sought 140P2024R0162

Question & Answer

Incumbent or Similar Awards

Contracts Similar to Sources Sought 140P2024R0162

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought 140P2024R0162

Similar Active Opportunities

Open contract opportunities similar to Sources Sought 140P2024R0162

Additional Details

Source Agency Hierarchy
INTERIOR, DEPARTMENT OF THE > NATIONAL PARK SERVICE > DSC CONTRACTING SERVICES DIVISION
FPDS Organization Code
1443-20000
Source Organization Code
100173195
Last Updated
July 23, 2024
Last Updated By
fbms_acq@ios.doi.gov
Archive Date
July 23, 2024