Search Contract Opportunities

150-ton cableway crane at the Hoover Dam that need   2

ID: 140R3024R0033 • Type: Solicitation

Description

Posted: Aug. 20, 2024, 1:06 p.m. EDT
Cableway Crane Refurbishment - Hoover Dam
AMENDMENT 0002 PURPOSE OF AMENDMENT: The purpose of this amendment is to: revise the Description Specifications, transmit the responses to offeror questions, incorporate drawings and provide the process to request the drawings, transmit the site visit sign-in sheet, extend the question due date, and extend the proposal due date.
AMENDMENT 0001 PURPOSE OF AMENDMENT: The purpose of this amendment is to correct the Site Visit date on page 85 L.5(b) of the solicitation document from Aug 1st, 2024 to Aug 6, 2024. The date and time for the Site Visit is Aug 6, 2024 @ 0800 am PD.
Posted: July 26, 2024, 1:51 p.m. EDT
Posted: July 24, 2024, 7:11 p.m. EDT
Background
The Bureau of Reclamation is issuing this solicitation for the refurbishment of a 150-ton cableway crane at the Hoover Dam. The goal of this contract is to ensure the crane operates safely and efficiently, supporting the agency's mission to manage water resources and provide hydroelectric power.

Work Details
The contractor shall furnish all necessary personnel, materials, equipment, services, and facilities to perform the following tasks:

1. Performance and Payment Bonds;
2. Mobilization and preparation;
3. Acquisition of all materials/equipment;
4. Transportation of all materials to the cableway;
5. Engineering/Safety Analysis and Services;
6. Onsite Construction;
7. Load Testing & Annual Inspection.

The work must comply with applicable ASME B30 standards and include safety measures for working at heights (approximately 200 feet). The contractor will also be responsible for developing rescue procedures for construction work in difficult-to-access areas.

Period of Performance
The contract performance period is expected to begin within 10 calendar days after award and must be completed within 730 calendar days.

Place of Performance
The construction projects will take place at the Hoover Dam, located in Boulder City, Nevada.

Overview

Response Deadline
Aug. 30, 2024, 8:00 p.m. EDT (original: Aug. 23, 2024, 8:00 p.m. EDT) Past Due
Posted
July 24, 2024, 7:11 p.m. EDT (updated: Aug. 20, 2024, 1:06 p.m. EDT)
Set Aside
None
Place of Performance
Not Provided
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$5,000,000 - $15,000,000 (AI estimate)
On 7/24/24 USBR Lower Colorado Basin Region, Boulder City, NV issued Solicitation 140R3024R0033 for 150-ton cableway crane at the Hoover Dam that need due 8/30/24. The opportunity was issued full & open with NAICS 237990 and PSC Z1KA.
Primary Contact
Name
Watanga, Maxwell   Profile
Phone
(702) 293-8045

Documents

Posted documents for Solicitation 140R3024R0033

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation 140R3024R0033

Incumbent or Similar Awards

Contracts Similar to Solicitation 140R3024R0033

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 140R3024R0033

Similar Active Opportunities

Open contract opportunities similar to Solicitation 140R3024R0033

Additional Details

Source Agency Hierarchy
INTERIOR, DEPARTMENT OF THE > BUREAU OF RECLAMATION > LOWER COLORADO REGIONAL OFFICE
FPDS Organization Code
1425-00030
Source Organization Code
100179359
Last Updated
Sept. 14, 2024
Last Updated By
fbms_acq@ios.doi.gov
Archive Date
Sept. 14, 2024