Substation (Primary 4), Redstone Arsenal, AL   4

ID: W9127825R0020 • Type: Sources Sought

Description

Posted: Feb. 26, 2025, 10:11 a.m. EST

Market Research and Sources Sought Notice for information on capability and availability of contractors to perform new construction for USACE customer at Redstone Arsenal, AL.

The purpose of this Market Research and Sources Sought Notice is to acquire information on the number and capability of qualified Small Business and Large Business firms interested in a prospective procurement of construction services at Redstone Arsenal, AL. This is a Sources Sought Notice, NOT a solicitation announcement. Accordingly, no contract award will result from this Sources Sought Notice, as it does not constitute a commitment by the Government. Responses to this Sources Sought Notice will be used by the government in making an appropriate acquisition decision.

USACE Mobile District is considering use of a Price Includes Variation Over Time

(PIVOT) strategy for the acquisition described below. Economic impacts continue to negatively influence the US market, causing price hikes in simple commodities and skilled labor. These impacts result in higher prices, longer acquisition schedules, decreased competition, and more frequent requests for additional funding from customers.

The PIVOT approach requires the offeror to offer multiple prices to span several periods; empowering contractors to hedge risk over the Government's predefined periods.

Offeror's prices remain valid for all periods and at the prices proposed for each individual period. Selection of the best value (under a best value selection methodology) is based upon the weighted average price, referred to as the Total Adjusted Price (TAP). The TAP is not the award amount but represents an indexed value by which to evaluate all pricing periods.

The U.S. Army Corps of Engineers, Mobile District, anticipates constructing a high voltage Electrical Primary Substation on Redstone Arsenal, Alabama. The project includes installation of high voltage electrical power transmission lines that will connect the new substation directly to existing substations, and to the future 3rd Tennessee Valley Authority (TVA) 161,000 volt transmission electrical power transmission feed. Work includes the substation, transformers, primary and secondary voltage switchgear with associated distribution loop, cable vault, control room and all associated duct banks with cabling. The prospective procurement will involve awarding a construction contract in the range of $25-$100 million. Proposed construction duration of 720 calendar days.

Sources being sought are firms with a North American Industry Classification System (NAICS) Code of 237130 with a Small Business Size Standard of $45 million. Responses should include the following information and shall not exceed a total of ten (10) pages:

1. Offeror's name, address, points of contact with telephone numbers and e-mail addresses.

2. Business size/classification to include any designations as Small Business, HUBZone, Service Disabled Veteran Owned, 8(a), Women-Owned shall be indicated on first page of submission.

3. Bonding capability (construction bonding level per single contract/task order and aggregate construction bonding level, both expressed in dollars along with current available bonding capacity.

4. Past Performance Information that documents the respondents experience performing projects similar to that described above. The referenced projects should be of similar scope and magnitude and should have been completed within the last eight years. Information should be provided in the form of Contract Performance Assessment Reporting System (CPARS), Past Performance Questionnaires (PPQs) or by providing the following information: Project title, location, general description of the construction to demonstrate similarity to the project listed above, the Offeror's role (i.e., prime contractor, subcontractor, etc.), dollar value of contract, duration, and name of the company, agency or government entity for which the work was performed with contact information (reference name, phone number and e-mail address).

NO HARDCOPY RESPONSES WILL BE ACCEPTED. ALL RESPONSES WILL BE ELECTRONIC and submitted in pdf format to the following email address: ariel.s.chamberlain@usace.army.mil and stephanie.m.scalise@usace.army.mil. The subject line of the email shall reference the Market Research number in the announcement and submittals are due no later than 28 February 2025. Electronic submittals will be retained for future reference; however, they are to be considered source sensitive and not subject to public disclosure.

Posted: Dec. 16, 2024, 3:06 p.m. EST
Posted: Dec. 16, 2024, 2:33 p.m. EST
Posted: Oct. 30, 2024, 9:22 a.m. EDT
Background
The U.S. Army Corps of Engineers (USACE), Mobile District, is seeking information on the capability and availability of contractors to perform new construction services at Redstone Arsenal, Alabama.

This Market Research and Sources Sought Notice aims to gather insights from both Small Business and Large Business firms regarding their interest in a prospective procurement for construction services. The agency's goal is to address the economic impacts affecting the market, which have led to increased prices and decreased competition.

The PIVOT strategy will be utilized to allow contractors to offer multiple prices across different periods, thereby managing risks associated with market fluctuations.

Work Details
The anticipated project involves constructing a high voltage Electrical Primary Substation at Redstone Arsenal, AL.

Key tasks include:
- Installation of high voltage electrical power transmission lines connecting the new substation to existing ones and the future TVA 161,000 volt transmission feed;
- Construction of the substation itself;
- Installation of transformers;
- Primary and secondary voltage switchgear;
- Associated distribution loop;
- Cable vault;
- Control room;
- All related duct banks with cabling.

The estimated contract value ranges from $25 million to $100 million, with a proposed construction duration of 720 calendar days.

Period of Performance
The contract will be performed over a period of approximately 720 calendar days.

Place of Performance
Redstone Arsenal, Alabama

Overview

Response Deadline
Feb. 28, 2025, 4:00 p.m. EST (original: Nov. 13, 2024, 3:00 p.m. EST) Past Due
Posted
Oct. 30, 2024, 9:22 a.m. EDT (updated: Feb. 26, 2025, 10:11 a.m. EST)
Set Aside
None
Place of Performance
Redstone Arsenal, AL United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Evaluation Criteria
Best Value
Est. Level of Competition
Low
Odds of Award
22%
On 10/30/24 USACE Mobile District issued Sources Sought W9127825R0020 for Substation (Primary 4), Redstone Arsenal, AL due 2/28/25. The opportunity was issued full & open with NAICS 237130 and PSC Y1JZ.
Primary Contact
Name
Ariel Chamberlain   Profile
Phone
None

Secondary Contact

Name
Stephanie Scalise   Profile
Phone
None

Documents

Posted documents for Sources Sought W9127825R0020

Question & Answer

Opportunity Lifecycle

Procurement notices related to Sources Sought W9127825R0020

Incumbent or Similar Awards

Contracts Similar to Sources Sought W9127825R0020

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought W9127825R0020

Similar Active Opportunities

Open contract opportunities similar to Sources Sought W9127825R0020

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT MOBILE
FPDS Organization Code
2100-W91278
Source Organization Code
100221437
Last Updated
March 15, 2025
Last Updated By
stephanie.m.scalise@usace.army.mil
Archive Date
March 15, 2025