Search Contract Opportunities

Replace the toilets at B946, Camp Carroll, Korea (Amendment 0001)

ID: W56VN924R0156-Amendment0001 • Type: Solicitation

Description

The purpose of amendment is to update SOW and Drawing for this requriement.

See attached updated RFQ and Drawing.

Background
The contract is issued by the Department of Defense for the purpose of replacing toilets at B946, Camp Carroll, Korea.
The goal of this contract is to ensure that the facilities meet current standards and provide necessary amenities for personnel stationed at the location.

Work Details
The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work as indicated in the drawings and specifications.

The specific tasks include:
1. Replace 4 toilet Comby units with lavatories on concrete walls, including necessary plumbing accessories, flush valves, and water supply lines using US origin materials or equal products.
2. Install 4 gate valves for flush valve replacement.
3. Replace 4 security mirrors on concrete walls with similar products currently installed.
4. Paint interior walls with latex paint (2 coats), including preparation and caulking.
5. Paint gypsum board ceilings (2 coats), including preparation and caulking.
6. Paint metal window frames with alkyd enamel (2 coats), including preparation and anti-corrosive primer.
7. Paint metal doors with frames using alkyd enamel (2 coats), including preparation and anti-corrosive primer.
8. Replace toggle switch covers (3 single type and 2 triple type).
9. Replace a water closet with a wall-mounted type including caulking on ceramic tile walls.

Period of Performance
The performance period shall be 150 calendar days, which includes 120 days allocated for procurement of US origin materials after the Notice to Proceed (NTP) is issued.

Place of Performance
Camp Carroll, Korea

Overview

Response Deadline
Aug. 15, 2024, 12:00 a.m. EDT Past Due
Posted
Aug. 7, 2024, 8:47 p.m. EDT
Set Aside
None
Place of Performance
Daegu, KR-27 Korea, South
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
The solicitation is open for 7 days, below average for the 646th Support Detachment.
On 8/7/24 646th Support Detachment issued Solicitation W56VN924R0156-Amendment0001 for Replace the toilets at B946, Camp Carroll, Korea (Amendment 0001) due 8/15/24. The opportunity was issued full & open with NAICS 236220 and PSC Z1AZ.
Primary Contact
Name
Eric Kim   Profile
Phone
(315) 763-5694

Secondary Contact

Name
Aaron Mallory   Profile
Phone
(315) 763-5681

Documents

Posted documents for Solicitation W56VN924R0156-Amendment0001

Question & Answer

Incumbent or Similar Awards

Contracts Similar to Solicitation W56VN924R0156-Amendment0001

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W56VN924R0156-Amendment0001

Similar Active Opportunities

Open contract opportunities similar to Solicitation W56VN924R0156-Amendment0001

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > AMC > ACC > ACC-OO > 411TH CSB
FPDS Organization Code
2100-W90VN9
Source Organization Code
500045693
Last Updated
Aug. 30, 2024
Last Updated By
eric.k.kim.mil@army.mil
Archive Date
Aug. 30, 2024