Search Contract Opportunities

P-381 MULTI-MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY MAINE   5

ID: N4008520R0021 • Type: Solicitation

Description

Posted: Aug. 13, 2021, 12:38 p.m. EDT

DESIGN-BID-BUILD, P-381, MULTI-MISSION DRY DOCK #1 LOCATED AT PORTSMOUTH NAVAL SHIPYARD IN KITTERY, MAINE

This project constructs a partitioned addition to dry dock #1 (DD1) w ithin the superflood basin area. The addition w ill consist of tw o bays, labeled dry dock #1 North (DD1N) and dry dock #1 West (DD1W). The existing dry dock #1 w ill be renamed dry dock #1 East. Both DD1N and DD1W w ill be of sufficient size and depth to support the maintenance and overhaul of Virginia (VA) Class submarines, Blocks I-IV. New construction w ill include concrete floors, w alls, and center w all separating DD1N and DD1W, new pump w ell systems, pump station building, portal crane rails, mooring hardw are, mechanical and electrical utilities, utility tunnels, and all appurtenances required to ensure an operational dry dock. Modifications w ill be made to the existing basin closure w all and to Berths 1 and 11 to prevent undermining and support fully dew atered conditions. The existing DD1 pumpw ell w ill be connected to the new pumpw ell system and the interior modified.

Posted: Aug. 13, 2021, 12:34 p.m. EDT
Posted: Feb. 22, 2021, 12:49 p.m. EST
Posted: Feb. 11, 2021, 12:55 p.m. EST
Posted: Jan. 22, 2021, 4:54 p.m. EST
Posted: Jan. 8, 2021, 3:24 p.m. EST
Posted: Dec. 30, 2020, 12:07 p.m. EST
Posted: Dec. 16, 2020, 5:29 p.m. EST
Posted: Dec. 11, 2020, 4:00 p.m. EST
Posted: Nov. 24, 2020, 2:48 p.m. EST
Posted: Nov. 13, 2020, 3:48 p.m. EST
Posted: Nov. 13, 2020, 1:48 p.m. EST
Posted: Oct. 16, 2020, 5:16 p.m. EDT
Posted: Oct. 6, 2020, 4:44 p.m. EDT
Posted: Sept. 23, 2020, 1:15 p.m. EDT
Posted: Sept. 18, 2020, 4:28 p.m. EDT
Posted: Sept. 10, 2020, 2:24 p.m. EDT
Posted: Aug. 31, 2020, 2:20 p.m. EDT
Background
The project involves the construction of a partitioned addition to dry dock #1 (DD1) within the superflood basin area at Portsmouth Naval Shipyard in Kittery, Maine. The addition will consist of two bays, labeled dry dock #1 North (DD1N) and dry dock #1 West (DD1W), with the existing dry dock #1 being renamed dry dock #1 East. Both DD1N and DD1W will be of sufficient size and depth to support the maintenance and overhaul of Virginia (VA) Class submarines, Blocks I-IV. New construction will include concrete floors, walls, a center wall separating DD1N and DD1W, new pump well systems, pump station building, portal crane rails, mooring hardware, mechanical and electrical utilities, utility tunnels, and all appurtenances required to ensure an operational dry dock. Modifications will be made to the existing basin closure wall and to Berths 1 and 11 to prevent undermining and support fully dewatered conditions. The existing DD1 pump well will be connected to the new pump well system and the interior modified.

Work Details
The work includes constructing a partitioned addition to dry dock #1 within the superflood basin area at Portsmouth Naval Shipyard in Kittery, Maine. This addition will consist of two bays, labeled dry dock #1 North (DD1N) and dry dock #1 West (DD1W), with the existing dry dock #1 being renamed dry dock #1 East. Both DD1N and DD1W will be designed to support the maintenance and overhaul of Virginia (VA) Class submarines, Blocks I-IV. The new construction will involve concrete floors, walls, a center wall separating DD1N and DD1W, new pump well systems, a pump station building, portal crane rails, mooring hardware, mechanical and electrical utilities, utility tunnels, and all appurtenances required for an operational dry dock. Additionally, modifications will be made to the existing basin closure wall and to Berths 1 and 11 to prevent undermining and support fully dewatered conditions. The existing DD1 pump well will be connected to the new pump well system.

Place of Performance
The construction projects will be performed at Portsmouth Naval Shipyard in Kittery, Maine.

Overview

Response Deadline
Feb. 26, 2021, 2:00 p.m. EST (original: Oct. 15, 2020, 2:00 p.m. EDT) Past Due
Posted
Aug. 31, 2020, 2:20 p.m. EDT (updated: Aug. 13, 2021, 12:38 p.m. EDT)
Set Aside
None
Place of Performance
Kittery, ME United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 8/31/20 Naval Facilities Engineering Command issued Solicitation N4008520R0021 for P-381 MULTI-MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY MAINE due 2/26/21. The opportunity was issued full & open with NAICS 237990 and PSC Y1PZ.
Primary Contact
Name
Brittany Cristelli   Profile
Phone
(757) 341-1978

Documents

Posted documents for Solicitation N4008520R0021

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation N4008520R0021

Award Notifications

Agency published notification of awards for Solicitation N4008520R0021

Contract Awards

Prime contracts awarded through Solicitation N4008520R0021

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation N4008520R0021

Similar Active Opportunities

Open contract opportunities similar to Solicitation N4008520R0021

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE NAVY > NAVFAC > NAVFAC ATLANTIC CMD > NAVFAC MID-ATLANTIC > NAVAL FAC ENGINEERING CMD MID LANT
FPDS Organization Code
1700-N40085
Source Organization Code
100513874
Last Updated
Aug. 13, 2021
Last Updated By
brittany.cristelli@navy.mil
Archive Date
March 13, 2021