Search Contract Opportunities

MT FLAP BOR 2980(1), Sun River Bridge Replacement   4

ID: 69056724B000016 • Type: Presolicitation

Description

Posted: Aug. 15, 2024, 5:49 p.m. EDT

UPDATE 08/15/2024: QA_08-15-2024.pdf posted to attachments.

PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement

LOCATION: 50 miles NW of Augusta, MT

WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge.

The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled shafts. The work may include as an Option demolition of the existing steel truss bridge upon completion of the new structure. See "Project Description" under attachments for additional information.

LENGTH: 0.36 miles

TENTATIVE COMPLETION DATE: Fall 2026

CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price

ESTIMATED PRICE RANGE: Between $10 million to $20 million

INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.

THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS

This project is anticipated to be solicited Fall 2024.

This project will include a Base schedule plus 1 option.

PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the follow button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.

Posted: Aug. 9, 2024, 7:21 p.m. EDT
Background
The project is initiated by the Western Federal Lands Highway Division, which is responsible for the construction and maintenance of federal highways. The mission of this division includes improving transportation infrastructure in national forests and other federal lands.

The goal of this contract is to replace the existing Sun River Bridge with a new structure that meets modern standards and enhances safety for users.

Work Details
The work involves constructing a new 3-span, 462-foot long precast-post-tensioned girder bridge located approximately 200 feet downstream from the existing bridge. The project includes new approach roadways on embankments and MSE wall approaches, with final surfacing consisting of gravel for the approaches and concrete for the bridge deck.

Abutments will be founded on both spread footings and piles within an MSE wall fill, while piers will be supported on 10-foot diameter drilled shafts. An optional task may include the demolition of the existing steel truss bridge upon completion of the new structure. The project also requires unclassified borrow, select topping, and aggregate to be sourced from commercial suppliers that must pass a weed inspection or provide a weed-free certification after award.

Period of Performance
The anticipated period of performance spans from Fall 2024 when solicitation documents are expected to be released, through to Fall 2026 for project completion.

Place of Performance
The construction projects will take place in Helena - Lewis and Clark National Forest, specifically about 50 miles northwest of Augusta, MT.

Overview

Response Deadline
None
Posted
Aug. 9, 2024, 7:21 p.m. EDT (updated: Aug. 15, 2024, 5:49 p.m. EDT)
Set Aside
None
Place of Performance
Augusta, MT 59410 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$10,000,000 - $20,000,000 (AI estimate)
Odds of Award
81%
On 8/9/24 Western Federal Lands Highway Division issued Presolicitation 69056724B000016 for MT FLAP BOR 2980(1), Sun River Bridge Replacement. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Contracts G. Office   Profile
Phone
(360) 619-7520

Documents

Posted documents for Presolicitation 69056724B000016

Question & Answer

Opportunity Lifecycle

Procurement notices related to Presolicitation 69056724B000016

Award Notifications

Agency published notification of awards for Presolicitation 69056724B000016

Incumbent or Similar Awards

Contracts Similar to Presolicitation 69056724B000016

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation 69056724B000016

Similar Active Opportunities

Open contract opportunities similar to Presolicitation 69056724B000016

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 690567 WESTERN FEDERAL LANDS DIV
FPDS Organization Code
6925-00070
Source Organization Code
100163919
Last Updated
Aug. 15, 2024
Last Updated By
rebekah.webb@dot.gov
Archive Date
Aug. 9, 2026