Update 10/18/2024: QA_10-18-2024.pdf posted to attachments.

Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip.

PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement

LOCATION: 50 miles NW of Augusta, MT

WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge.

The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled shafts. The work may include as an Option demolition of the existing steel truss bridge upon completion of the new structure.

LENGTH: 0.36 miles

TENTATIVE COMPLETION DATE: Fall 2026

CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price

ESTIMATED PRICE RANGE: Between $10 million to $20 million

INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.

THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS

Posted: Nov. 21, 2024, 2:02 p.m. EST
Posted: Nov. 13, 2024, 12:39 p.m. EST
Posted: Nov. 12, 2024, 6:03 p.m. EST
Posted: Nov. 12, 2024, 11:53 a.m. EST
Posted: Nov. 8, 2024, 4:09 p.m. EST
Posted: Nov. 7, 2024, 6:17 p.m. EST
Posted: Nov. 6, 2024, 3:53 p.m. EST
Posted: Nov. 6, 2024, 2:18 p.m. EST
Posted: Nov. 5, 2024, 3:55 p.m. EST
Posted: Nov. 5, 2024, 11:05 a.m. EST
Posted: Nov. 4, 2024, 6:45 p.m. EST
Posted: Nov. 4, 2024, 12:46 p.m. EST
Posted: Oct. 31, 2024, 7:35 p.m. EDT
Posted: Oct. 24, 2024, 6:12 p.m. EDT
Posted: Oct. 24, 2024, 3:28 p.m. EDT
Posted: Oct. 23, 2024, 3:27 p.m. EDT
Posted: Oct. 21, 2024, 5:35 p.m. EDT
Posted: Oct. 21, 2024, 1:42 p.m. EDT
Posted: Oct. 18, 2024, 6:05 p.m. EDT
Posted: Oct. 18, 2024, 4:46 p.m. EDT
Posted: Oct. 16, 2024, 7:03 p.m. EDT
Posted: Oct. 15, 2024, 7:38 p.m. EDT
Background
The project is initiated by the Federal Highway Administration (FHWA) under the Montana Federal Lands Access Program (MT FLAP). The mission of this program is to improve access to federal lands and enhance transportation infrastructure.

The goal of this contract is to replace the existing Sun River Bridge, which is critical for local transportation and safety.

Work Details
The work consists of constructing a new bridge approximately 200 feet downstream from the existing bridge, including new approaches on embankments and Mechanically Stabilized Earth (MSE) wall approaches.

The project involves building a three-span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. The abutments will be founded on both spread footings and piles within an MSE wall fill, while piers will be supported on 10-foot diameter drilled shafts.

Additionally, there may be an option for the demolition of the existing steel truss bridge upon completion of the new structure. Final surfacing will consist of gravel for the approaches and concrete for the bridge.

Period of Performance
The contract is expected to be completed by Fall 2026.

Place of Performance
50 miles NW of Augusta, MT

Overview

Response Deadline
Nov. 20, 2024, 5:00 p.m. EST (original: Nov. 13, 2024, 5:00 p.m. EST) Past Due
Posted
Oct. 15, 2024, 7:38 p.m. EDT (updated: Nov. 21, 2024, 3:20 p.m. EST)
Set Aside
None
Place of Performance
Augusta, MT 59410 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Est. Level of Competition
Average
Est. Value Range
$10,000,000 - $20,000,000 (value based on agency estimated range)
Vehicle Type
Indefinite Delivery Contract
On 10/15/24 Western Federal Lands Highway Division issued Solicitation 69056724B000016 for MT FLAP BOR 2980(1), Sun River Bridge Replacement due 11/20/24. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Contracts G. Office   Profile
Phone
(360) 619-7520
Fax
(360) 619-7932

Documents

Posted documents for Solicitation 69056724B000016

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation 69056724B000016

Award Notifications

Agency published notification of awards for Solicitation 69056724B000016

Contract Awards

Prime contracts awarded through Solicitation 69056724B000016

Incumbent or Similar Awards

Contracts Similar to Solicitation 69056724B000016

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 69056724B000016

Similar Active Opportunities

Open contract opportunities similar to Solicitation 69056724B000016

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 690567 WESTERN FEDERAL LANDS DIV
FPDS Organization Code
6925-00070
Source Organization Code
100163919
Last Updated
Nov. 21, 2024
Last Updated By
robert.kolln@dot.gov
Archive Date
June 30, 2025