Scope of Work Dewatering Pump Flat Lifting Skids (3)

1. Project Description

The Saint Paul District of the U.S. Army Corps of Engineers (USACE) has issued this solicitation for the procurement of three (3) lifting skids for dewatering pumps for the St. Paul District Corps of Engineers Maintenance & Repair section in Fountain City, WI.

2. Project Scope Statement

The current units have deteriorated past a repairable condition. This project is meant to supply all the major components necessary to replace the current units. The Maintenance & Repair section will remove the pumps from the old lifting skids and reinstall the pumps on the new skids. Delivery is to be no later than August 1st, 2024.

3. System Components

Specifications for each dewatering pump lifting skid assembly shall be:

  • Flat lifting skid shall be constructed of steel (no stainless or aluminum) and be equipped with fixed rigid steel rigging assembly that holds up the overhead rigging beam.
  • The skid and rigid steel rigging may be made of square or pipe steel stock, however, these material types can hold water and suffer freeze damage during winter operations. All ends must be fully open to prevent the water from being trapped and ensure galvanizing reaches those surfaces.
  • The rigid steel rigging shall include an overhead rigging beam (which matches the overall length of the skid) equipped with two stainless steel load rated swivel hoisting points located 24 in from each end of the overhead rigging beam. Stainless steel shackles may be used provided they utilize either a hole in the beam for the shackle pin OR a fixed lifting eye assembly that bolts onto the rigging beam.
  • The overhead rigging beam shall have 3 4 holes drilled every 6 inches on center along its length to enable top mounting bracket installations of various pump assembly configurations.
  • All steel components of the lifting skid and rigging assembly shall be entirely galvanized.
  • The flat lifting skid base design shall include a uniform bolt hole pattern grid of 3/4 bolt holes, 12 on center, across the entire area of the base to allow for securing various pump configurations.
  • The flat lifting skid design shall include fork pockets in the base for moving the skid with a fork truck.
  • The steel lifting skid and rigging assembly shall be no larger than 96 long by 54 wide and no smaller than 93 long by 51 wide to allow for rigid brackets and hardware; and the platform shall not have side walls to allow water and debris to flow off it when being pulled from the water (see attached drawing). 84 maximum overall height from ground to top of rigging beam. If utilizing fixed lifting eyes, maximum height of 88 from ground to top of eye.
  • The rigid steel overhead rigging beam shall be orientated the long way over the skid base no higher than 72 and no lower than 71 high from skid floor to bottom of rigging beam (see attached drawing).
  • The flat lifting skid, rigid steel rigging assembly, and the picking points shall all be load rated for no less than 10,000 lbs. and load tested to 125% of load to include certification documentation with delivery.
  • All lifting skid and rigging assembly components must meet ASME B30.20 standards for below-the-hook lifting devices as well as BTH-1 Design for Below the Hook Standard and must also be designed and stamped by a Professional Engineer (PE).
  • Manufacturing drawings and documentation of load ratings shall be provided for each separate lifting skid and rigging assembly.
  • The lifting skid and rigging assembly shall be labeled with the empty skid weight, load capacity, manufacturer model number, and manufacturer serial number.

Delivery Address:

US Army Corps of Engineers

Fountain City Service

431 North Shore Drive

Fountain City, WI 54629

Posted: Jan. 30, 2024, 4:58 p.m. EST
Posted: Jan. 29, 2024, 1:15 p.m. EST
Posted: Jan. 19, 2024, 10:40 a.m. EST
Posted: Jan. 19, 2024, 8:27 a.m. EST
Background
The Saint Paul District of the U.S. Army Corps of Engineers (USACE) has issued this solicitation for the procurement of three (3) lifting skids for dewatering pumps for the St. Paul District Corps of Engineers – Maintenance & Repair section in Fountain City, WI.

Work Details
The project scope is to supply all the major components necessary to replace the current units. The Maintenance & Repair section will remove the pumps from the old lifting skids and reinstall the pumps on the new skids.
Specifications for each dewatering pump lifting skid assembly include details such as construction material, dimensions, load capacity, and compliance with ASME B30.20 standards.
The delivery address is US Army Corps of Engineers, Fountain City Service, 431 North Shore Drive, Fountain City, WI 54629.

Period of Performance
Delivery is to be no later than August 1st, 2024.

Place of Performance
Fountain City, WI 54629

Overview

Response Deadline
Feb. 20, 2024, 6:00 p.m. EST Past Due
Posted
Jan. 19, 2024, 8:27 a.m. EST (updated: Feb. 2, 2024, 3:22 p.m. EST)
Set Aside
Small Business (SBA)
Place of Performance
Fountain City, WI 54629 United States
Source
SAM

Current SBA Size Standard
500 Employees
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
62% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 1/19/24 USACE St. Paul District issued Synopsis Solicitation W912ES24Q0041 for Lifting Skids due 2/20/24. The opportunity was issued with a Small Business (SBA) set aside with NAICS 332312 (SBA Size Standard 500 Employees) and PSC 5450.
Primary Contact
Name
Karl Just   Profile
Phone
(651) 290-5768

Secondary Contact

Name
Jesse Onkka   Profile
Phone
(651) 290-5444

Documents

Posted documents for Synopsis Solicitation W912ES24Q0041

Question & Answer

Opportunity Lifecycle

Procurement notices related to Synopsis Solicitation W912ES24Q0041

Award Notifications

Agency published notification of awards for Synopsis Solicitation W912ES24Q0041

Contract Awards

Prime contracts awarded through Synopsis Solicitation W912ES24Q0041

Incumbent or Similar Awards

Contracts Similar to Synopsis Solicitation W912ES24Q0041

Potential Bidders and Partners

Awardees that have won contracts similar to Synopsis Solicitation W912ES24Q0041

Similar Active Opportunities

Open contract opportunities similar to Synopsis Solicitation W912ES24Q0041

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > MVD > W07V ENDIST ST PAUL
FPDS Organization Code
2100-W912ES
Source Organization Code
100221313
Last Updated
March 6, 2024
Last Updated By
karl.p.just@usace.army.mil
Archive Date
March 6, 2024