Posted: Nov. 7, 2023, 2:14 p.m. EST

GAOA

This project consists of site improvements to the Kneff Lake Day Use Area. The existing concrete block retaining wall will be removed. A new, tiered boulder wall will be constructed to expand the main beach area. The bottom landing on the main concrete stair will be reconstructed. A kayak boat roller system will be installed on the existing west staircase. Work includes, but is not limited to, mobilization, construction staking, SESC, cofferdams, clearing and grubbing, removal of block wall, aggregate base placement, sheet pile, miscellaneous concrete structures, landscape boulders, placing topsoil and restoration.

Kneff Lake CG Day Use Area, Crawford County, MI

AMEND 0001: corrects line item 0001AP quantity, revised schedule of items is posted, and extends due date for bids to 11/14/2023 by 2 pm Eastern.

Questions and Answers/RFIs are posted as of 11/7/23. All questions have been answered at this time.

Posted: Nov. 2, 2023, 1:13 p.m. EDT
Posted: Oct. 6, 2023, 3:45 p.m. EDT
Background
The project involves site improvements to the Kneff Lake Day Use Area, including the removal of an existing concrete block retaining wall, construction of a new tiered boulder wall, reconstruction of the bottom landing on the main concrete stair, and installation of a kayak boat roller system. The work also includes mobilization, construction staking, SESC, cofferdams, clearing and grubbing, removal of block wall, aggregate base placement, sheet pile, miscellaneous concrete structures, landscape boulders, placing topsoil and restoration.

Work Details
The project involves various construction tasks such as removing and constructing retaining walls, reconstructing stair landings, and installing a boat roller system. The work also includes tasks like mobilization, construction staking, SESC (Soil Erosion and Sedimentation Control), cofferdams, clearing and grubbing, aggregate base placement, sheet pile installation, landscape boulder placement, topsoil placement and restoration.

Period of Performance
The period of performance for the contract is from 11/15/2023 to 09/30/2024.

Place of Performance
The construction projects will be performed at Kneff Lake Campground in Crawford County. The driving directions to the site are provided as follows: From Grayling – Travel east on M-72 for 6.5 miles. Turn right and travel south on Stephan Bridge Road for 1 mile. Turn left and travel east on FR 4003 and drive about 1 mile.

Overview

Response Deadline
Nov. 8, 2023, 2:00 p.m. EST Past Due
Posted
Oct. 6, 2023, 3:45 p.m. EDT (updated: Nov. 7, 2023, 2:14 p.m. EST)
Set Aside
Small Business (SBA)
Place of Performance
MI United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 10/6/23 USFS Region 9: Eastern Region issued Solicitation 12445524R0002 for GAOA Kneff Lake Improvements (Day Use Area) due 11/8/23. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237990 (SBA Size Standard $45 Million) and PSC Z2PZ.
Primary Contact
Name
Debra Brinn   Profile
Phone
(906) 259-9598

Documents

Posted documents for Solicitation 12445524R0002

Question & Answer

Incumbent or Similar Awards

Contracts Similar to Solicitation 12445524R0002

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 12445524R0002

Similar Active Opportunities

Open contract opportunities similar to Solicitation 12445524R0002

Additional Details

Source Agency Hierarchy
AGRICULTURE, DEPARTMENT OF > FOREST SERVICE > USDA-FS, CSA EAST 13
FPDS Organization Code
12C2-124455
Source Organization Code
500169666
Last Updated
Jan. 8, 2024
Last Updated By
debra.brinn@usda.gov
Archive Date
Jan. 8, 2024