FY24 Construction of Lake Marion Orangeburg Berkeley Reach Water Line Phase 1   2

ID: W912HP24R0001 • Type: Solicitation

Description

Posted: Nov. 27, 2023, 2:14 p.m. EST
DESCRIPTION OF WORK: The Orangeburg-Berkeley Reach Phase 1 Water Main contract consists of the furnishing, installing, and placing into successful operation approximately 36,250 LF of 20-inch diameter water main pipe, 5,010 LF of 26-inch diameter horizontal directionally drilled pipe, 2 booster pump stations, and all associated work. The contract includes all pipe, valves, appurtenances, roadway bores, horizontally directionally drilled pipe, backfill, compaction, testing, quality control, safety, and all other related work required to place the project into successful operation. This contract w ill be a portion of the Lake Marion Regional Water System with portions owned, operated, and maintained by both Santee Cooper, Berkeley County, and Orangeburg County. The Contractor w ill be responsible for coordinating work with local utility owners, property owners, Lake Marion Water Treatment Plant personnel, Berkeley County, and Orangeburg County. MAGNITUDE OF WORK: $20,000,000 to $25,000,000The North American Industry Classification System Code (NAICS) is: 237110 Water and Sewer Line Related. This solicitation is hereby posted and active as of 11 October 2023. AMENDMENT 0001 - The purpose of this amendment is to extend the proposal due date and update data see Summary of Changes on the Amendment. This Amendment is hereby posted and active as 16 October 2023. AMENDMENT 0002 - The purpose of this amendment is to extend the proposal due date - see Summary of Changes on the Amendment. This Amendment is hereby posted and active as 07 November 2023. Amendment 0003 - The purpose of this amendment provide additional documents see Summary of Changes on the Amendment This Amendment is hereby posted and active as 21 November 2023. AMENDMENT 0004 - The purpose of this amendment is to extend the proposal due date see Summary of Changes on the Amendment. This Amendment is hereby posted and active as 27 November 2023.
Posted: Nov. 21, 2023, 10:07 a.m. EST
Posted: Nov. 7, 2023, 1:01 p.m. EST
Posted: Oct. 16, 2023, 1:29 p.m. EDT
Posted: Oct. 11, 2023, 9:14 a.m. EDT
Background
The Orangeburg-Berkeley Reach Phase 1 Water Main contract is part of the Lake Marion Regional Water System, which is owned, operated, and maintained by Santee Cooper, Berkeley County, and Orangeburg County.

The goal of this contract is to enhance the water distribution infrastructure in the region by installing significant water main pipelines and associated facilities. The agency aims to ensure a reliable water supply through this construction project.

Work Details
The contract involves the furnishing, installing, and placing into successful operation approximately 36,250 linear feet (LF) of 20-inch diameter water main pipe and 5,010 LF of 26-inch diameter horizontal directionally drilled pipe.

Additionally, it includes the construction of two booster pump stations and all associated work necessary for successful operation. This encompasses all pipe, valves, appurtenances, roadway bores, backfill, compaction, testing, quality control measures, safety protocols, and any other related work required.

The contractor must coordinate with local utility owners and property owners as well as personnel from the Lake Marion Water Treatment Plant.

Period of Performance
The contract will be executed over a specified duration that encompasses all phases of construction until successful operation is achieved.

Place of Performance
The construction projects will take place along roadways and private easements in Orangeburg County.

Overview

Response Deadline
Nov. 30, 2023, 12:00 p.m. EST (original: Nov. 10, 2023, 11:00 a.m. EST) Past Due
Posted
Oct. 11, 2023, 9:14 a.m. EDT (updated: Nov. 27, 2023, 2:14 p.m. EST)
Set Aside
Small Business (SBA)
Place of Performance
Not Provided
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 10/11/23 USACE Charleston District issued Solicitation W912HP24R0001 for FY24 Construction of Lake Marion Orangeburg Berkeley Reach Water Line Phase 1 due 11/30/23. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237110 (SBA Size Standard $45 Million) and PSC Y1NE.
Primary Contact
Name
EVELYN HALLIBURTON-SHANNON   Profile
Phone
(843) 329-8208

Secondary Contact

Name
ADDISON LAYFIELD   Profile
Phone
(843) 329-8194

Documents

Posted documents for Solicitation W912HP24R0001

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation W912HP24R0001

Award Notifications

Agency published notification of awards for Solicitation W912HP24R0001

Contract Awards

Prime contracts awarded through Solicitation W912HP24R0001

Incumbent or Similar Awards

Contracts Similar to Solicitation W912HP24R0001

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912HP24R0001

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912HP24R0001

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT CHARLESTO
FPDS Organization Code
2100-W912HP
Source Organization Code
500039401
Last Updated
Nov. 26, 2024
Last Updated By
EVELYN.HALLIBURTON-SHANNON@USACE.ARMY.MIL
Archive Date
Nov. 26, 2024