Search Contract Opportunities

Folsom Dam Raise Mormon Island Auxiliary Dam (MIAD)   4

ID: W9123823B0012 • Type: Solicitation

Description

Posted: May 19, 2023, 10:45 a.m. EDT

Bid Abstract posted.

***Amendment 0003 Posted. *** Amendment 0002 Posted. Amendment 0001 with current Wage Determination Posted. Folsom Dam Raise Project Raising Mormon Island Auxiliary Dam (MIAD) at Folsom Lake, California. Work consists of raising the Mormon Island Auxiliary Dam (MIAD) 3.5 feet by constructing a floodwall structure along its 4,900 feet long crest. A seepage cutoff wall, 30 inches wide with an average depth of 17 feet, will tie the raised section to the dam?s core. Riprap will be placed on the upstream side of the floodwall. Per FAR 36.204(ii) the estimated magnitude for this requirement is between $10M and $25M. This solicitation will use PSC Code Y1LC - Construction of Tunnels and Subsurface Structures and NAICS code 237990 - Other Heavy and Civil Engineering Construction. This solicitation is set-aside 100% for Small Businesses.

Posted: May 12, 2023, 10:17 a.m. EDT
Posted: May 9, 2023, 6:14 p.m. EDT
Posted: April 28, 2023, 2:35 p.m. EDT
Posted: April 25, 2023, 3:35 p.m. EDT
Posted: April 18, 2023, 7:36 p.m. EDT
Background
The U.S. Army Corps of Engineers, Sacramento Contracting Division has issued a solicitation for the Folsom Dam Raise Project. The work consists of constructing a floodwall structure along the 4,900 feet long crest of the dam, as well as building a seepage cutoff wall and placing riprap on the upstream side of the floodwall. The estimated magnitude for this requirement falls between $10M and $25M. The solicitation is set-aside 100% for Small Businesses.

Work Details
The project involves raising the Mormon Island Auxiliary Dam (MIAD) by 3.5 feet through construction of a floodwall structure along its 4,900 feet long crest. Additionally, a seepage cutoff wall, 30 inches wide with an average depth of 17 feet, will tie the raised section to the dam’s core. Riprap will be placed on the upstream side of the floodwall.

Place of Performance
The geographic location for performance of this construction project is Folsom Lake, California.

Overview

Response Deadline
May 18, 2023, 5:00 p.m. EDT Past Due
Posted
April 18, 2023, 7:36 p.m. EDT (updated: May 19, 2023, 10:45 a.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Not Provided
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
78% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 4/18/23 USACE Sacramento District issued Solicitation W9123823B0012 for Folsom Dam Raise Mormon Island Auxiliary Dam (MIAD) due 5/18/23. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237990 (SBA Size Standard $45 Million) and PSC Y1LC.
Primary Contact
Name
Nadine Catania   Profile
Phone
(916) 557-5191

Secondary Contact

Name
Katie Randall   Profile
Phone
(916) 557-7024

Documents

Posted documents for Solicitation W9123823B0012

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation W9123823B0012

Award Notifications

Agency published notification of awards for Solicitation W9123823B0012

Contract Awards

Prime contracts awarded through Solicitation W9123823B0012

Incumbent or Similar Awards

Contracts Similar to Solicitation W9123823B0012

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W9123823B0012

Similar Active Opportunities

Open contract opportunities similar to Solicitation W9123823B0012

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > US ARMY ENGINEER DISTRICT SACRAMENT
FPDS Organization Code
2100-W91238
Source Organization Code
100221301
Last Updated
June 18, 2023
Last Updated By
nadine.l.catania@usace.army.mil
Archive Date
June 18, 2023