Search Contract Opportunities

Design Build Central Utilities Plant - Reno NV -- Y1NB   3

ID: QSE--36C10F24R50000 • Type: Solicitation

Description

Design Build Central Utilities Plant - Reno NV -- Y1NB
Design Build Central Utilities Plant - Reno NV
Scope of Work Replace Seismically Deficient Boiler Plant, Building 8 The contractor will provide all labor, material, and equipment necessary to complete a final project design along with complete physical construction necessary to deliver a new Central Utility Plant (CUP) at the VA Sierra Nevada Health Care System (VASNHCS) in Reno, Nevada. The project scope includes associated work activities consisting of, but not limited to, improvements at an existing gravel park lot, demolition of the facility's current utility building, the Boiler Plant, Building 8, conversion of the Boiler Plant location into a parking lot, and installation of a bulk oxygen storage room with associated tanks and equipment. More specifically, the contractor will design, construct and achieve the following activities in listed order; 1) improvements to an existing gravel parking lot to pave, stripe, drain and light the lot for the facility's use during project duration. The lot will also include an emergency call system which matches that in other similar lots at the facility. 2) build an approximately 11,000 GSF CUP structure housing the boilers, chillers, cooling towers, and the bulk oxygen system to provide steam, heating and cooling for the entire VASNHCS campus. Additionally, as the current facility main power feed runs through the courtyard of the existing Boiler Plant, the project will also include all electrical work required to relocate the electrical service from the present location to a new location within the CUP. 3) thoroughly test all equipment and systems in the CUP to assure complete functionality of the systems and equipment. Once testing has been completed and accepted by the VA, make final connection of all utility systems to existing utility feeds on the east side of Kirman Avenue at the location where the utility feeds currently exit the Boiler Plant. 4) demolish the existing Boiler Plant once the CUP is fully operational and providing all utility services to the facility. This scope all includes removal of hazardous materials prior to demolition of the building. 5) convert the Boiler Plant location, once demolition is complete, into a paved, striped surface level parking lot, including lighting and proper drainage. 6) re-stripe the lot improved per item 1 above to meet VA criteria for the proper allocation of standard and handicap stalls. For informational purposes only and to provide prospective offerors with a greater understanding of the Government's requirements, accompanying this RFP solicitation are the following documents: (1) conceptual drawings indicating project siting, phasing, and preliminary design; (2) narratives describing technical approach to the project; and (3) supporting design specifications and documents. Note this preliminary design information is provided for information only. The Design Build Contractor selected for this project is under no obligation to incorporate this conceptual design information into their final project design. The contractor will provide all required professional design services within all required disciplines necessary to complete the above referenced scope. All disciplines shall have a current professional license issued by the State of Nevada or equivalent document from another state. Although a geotechnical report is being provided, the contractor will be responsible for completing their own geotechnical analysis as part of project design development. All construction activities will be accomplished by firms which have a current license issued by the Nevada State Contractors Board or equivalent document from another state . All design documents are to be developed in accordance with the VA Technical Design Library, which can be accessed at https://www.cfm.va.gov/til/. The final design and construction of the project will fully incorporate the requirements listed in the referenced site. No deviations will be allowed unless prior approval is provided by the VA Contracting Officer.
Background
The VA Sierra Nevada Health Care System (VASNHCS) in Reno, Nevada requires the construction of a new Central Utility Plant (CUP) to replace the existing seismically deficient Boiler Plant, Building 8. The project also includes improvements to an existing gravel parking lot, demolition of the current utility building, installation of a bulk oxygen storage room, and associated work activities.

Work Details
The contractor is responsible for providing all labor, material, and equipment necessary to complete the final project design and physical construction of the new CUP. This includes paving, striping, draining, and lighting an existing gravel parking lot; constructing an approximately 11,000 GSF CUP structure housing boilers, chillers, cooling towers, and bulk oxygen system; relocating the electrical service from the present location to a new location within the CUP; testing all equipment and systems in the CUP; demolishing the existing Boiler Plant; converting the Boiler Plant location into a paved parking lot; re-striping the improved parking lot to meet VA criteria for standard and handicap stalls; and ensuring compliance with VA Technical Design Library requirements.

Place of Performance
The construction projects will be performed at the VA Sierra Nevada Health Care System (VASNHCS) in Reno, Nevada.

Overview

Response Deadline
Aug. 29, 2024, 9:00 p.m. EDT (original: June 17, 2024, 5:00 p.m. EDT) Past Due
Posted
May 17, 2024, 4:19 p.m. EDT (updated: July 19, 2024, 11:14 a.m. EDT)
Set Aside
Service Disabled Veteran Owned Small Business (SDVOSBC)
Place of Performance
; 975 Kirman Ave Reno, NV 89502 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$20,000,000 - $40,000,000 (AI estimate)
On 5/17/24 VA Office of Construction and Facilities Management issued Solicitation QSE--36C10F24R50000 for Design Build Central Utilities Plant - Reno NV -- Y1NB due 8/29/24. The opportunity was issued with a Service Disabled Veteran Owned Small Business (SDVOSBC) set aside with NAICS 236220 (SBA Size Standard $45 Million) and PSC Y1NB.
Primary Contact
Title
Contracting Officer
Name
Ashok K. Singh   Profile
Phone
(202) 615-0621

Documents

Posted documents for Solicitation QSE--36C10F24R50000

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation QSE--36C10F24R50000

Incumbent or Similar Awards

Contracts Similar to Solicitation QSE--36C10F24R50000

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation QSE--36C10F24R50000

Similar Active Opportunities

Open contract opportunities similar to Solicitation QSE--36C10F24R50000

Additional Details

Source Agency Hierarchy
VETERANS AFFAIRS, DEPARTMENT OF > VETERANS AFFAIRS, DEPARTMENT OF > OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)
FPDS Organization Code
3600-0010F
Source Organization Code
100167092
Last Updated
Nov. 1, 2024
Last Updated By
ashok.singh@va.gov
Archive Date
Nov. 1, 2024