CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail   3

ID: 6982AF19B000019 • Type: Solicitation

Description

TOTAL SMALL BUSINESS SET-ASIDE

PROJECT DETAILS: CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail

This project will consist of replacement and reconstruction of the approximately 2,871-foot-long, ABA accessible, raised timber boardwalk trail (6-feet wide) that was completely destroyed during flash flooding on August 5, 2022. The project also includes removal of remaining portions of damaged and displaced boardwalk from sensitive environmental areas including wilderness, reconstructing the trailhead parking lot, and reconstructing a 400-foot section of roadway with special rock embankment. The boardwalk alignment will be placed in a modified alignment to follow the new post-flashflood stream course (August 2022 and Tropical Storm Hillary August 2023 events).

All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints including paleontological monitoring, limitations on large equipment in the boardwalk area, and matting that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of roadway and parking lot construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude within National Parks, National Forests, or similar environments is required.

Principle work items include:

  • 2,100 square yards of thermally modified timber structural decking,
  • 58 thousand board feet measure (MFBM) of structural timber, treated,
  • 5,800 linear feet of timber, 6-inch curbing,
  • 700 linear feet of timber bridge railing,
  • 650 each helical piles (2-7/8 , 5-1/2 & 7 diameter),
  • 1,300 square yards of removal of timber boardwalk debris (by helicopter)
  • 2,000 cubic yards of embankment construction,
  • 400 cubic yards of special rock embankment,
  • 680 square yards of concrete sidewalk and pavement,
  • 400 linear feet of concrete curb, and
  • 1 each vault toilet (double occupancy unit)

The anticipated advertisement date for the project is September 2024 with construction anticipated from November 2024 to June 2025.

The estimated price range of the project work is between $5,000,000 and $10,000,000.

Background
The project is issued by the National Park Service and focuses on the reconstruction of the Salt Creek Interpretive Trail, which was severely damaged by flash flooding events in August 2022 and August 2023.

The goal of the contract is to restore access to this trail while ensuring compliance with environmental regulations and standards for accessibility.

Work Details
The project involves the replacement and reconstruction of a 2,871-foot-long, ADA accessible raised timber boardwalk trail. Key tasks include:
- Replacement of approximately 2,100 square yards of thermally modified timber structural decking.
- Installation of 58 thousand board feet measure (MFBM) of treated structural timber.
- Construction of 5,800 linear feet of timber curbing and 700 linear feet of timber bridge railing.
- Installation of 650 helical piles in varying diameters.
- Removal of 1,300 square yards of timber boardwalk debris via helicopter.
- Embankment construction totaling 2,000 cubic yards, including 400 cubic yards of special rock embankment.
- Construction of 680 square yards of concrete sidewalk and pavement along with 400 linear feet of concrete curb.
- Installation of a double occupancy vault toilet unit.

The work will be conducted in sensitive cultural and natural resource areas with numerous environmental constraints requiring careful planning and execution.

Period of Performance
Construction is anticipated to occur from November 2024 to June 2025.

Place of Performance
The construction projects will take place within the boundaries of the National Park Service's jurisdiction where the Salt Creek Interpretive Trail is located.

Overview

Response Deadline
Oct. 16, 2024, 4:30 p.m. EDT (original: Oct. 3, 2024, 4:00 p.m. EDT) Past Due
Posted
Sept. 3, 2024, 4:30 p.m. EDT (updated: Nov. 12, 2024, 3:41 p.m. EST)
Set Aside
Small Business (SBA)
Place of Performance
Death Valley, CA United States
Source
SAM
Links

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 9/3/24 Central Federal Lands Highway Division issued Solicitation 6982AF19B000019 for CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail due 10/16/24. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237990 (SBA Size Standard $45 Million) and PSC Y1PZ.
Primary Contact
Name
Kelly Palmer   Profile
Phone
None

Documents

Posted documents for Solicitation 6982AF19B000019

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation 6982AF19B000019

Award Notifications

Agency published notification of awards for Solicitation 6982AF19B000019

Incumbent or Similar Awards

Contracts Similar to Solicitation 6982AF19B000019

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 6982AF19B000019

Similar Active Opportunities

Open contract opportunities similar to Solicitation 6982AF19B000019

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
Nov. 13, 2024
Last Updated By
kelly.palmer@dot.gov
Archive Date
Nov. 13, 2024