Search Contract Opportunities

Building 66041 Repair Lab 103B and Dome, KAFB

ID: W912PP22Q0007 • Type: Award Notice

Description

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.

The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 66041 Repair Lab 103B and Dome 102. The work shall include the following requirements listed in the specific requirements. The contractor shall assure the attached waste summary checklist and DD Form 1354 are completed within three (3) working days of place in service date and submitted to USACE and Kirtland AFB Real Property office to get it staffed to the BCE for signature, at the conclusion of the project.

2. SPECIFIC REQUIREMENTS:

  1. Demolition
    1. Contractor must remove abandoned conduit and j-boxes, as indicated on the Not For Construction drawings.
    2. Contractor must remove abandoned A/C unit, as indicated on the Not For Construction drawings.
    3. Contractor must remove existing insulation, as indicated on the Not For Construction drawings.
    4. Contractor must remove existing door hardware, as indicated on the Not For Construction drawings.
    5. Contractor must remove existing motion sensor and ceiling tile, as indicated on the Not For Construction drawings.
    6. Contractor must remove existing badge reader, as indicated on the Not For Construction drawings.
  2. Construction
    1. Contractor must repair, float, texture and paint existing wall, as indicated on the Not For Construction drawings.
    2. Contractor must provide and install new door hardware, as indicated on the Not For Construction drawings.
    3. Contractor must provide and install new gyp. bd., as indicated on the Not For Construction drawings.
    4. Contractor must provide and install new man bars, viewport and dielectric break on existing duct work, as indicated on the Not For Construction drawings.
    5. Contractor must seal all penetrations and ground existing conduit, as indicated on the Not For Construction drawings.
    6. Contractor must secure existing hatches, as indicated on the Not For Construction drawings.
    7. Contractor must replace existing gutter, as indicated on the Not For Construction drawings.
    8. Contractor must provide and install new insulation, as indicated on the Not For Construction drawings.
    9. Contractor must patch existing wall, as indicated on the Not For Construction drawings.

Overview

Award ID
Reported Award
$201,664
Award Date
Feb. 1, 2022
Posted
Feb. 1, 2022, 3:38 p.m. EST
Set Aside
8(a) Sole Source (8AN)
Place of Performance
Kirtland AFB, NM United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Sole Source
Signs of Shaping
70% of obligations for similar contracts within the Department of the Army were awarded full & open.
Building 66041 Repair Lab 103B and Dome, KAFB (W912PP22Q0007) was awarded to Altima Construction on 2/1/22 by USACE Albuquerque District.
Primary Contact
Name
Glenda D. Kohlieber   Profile
Phone
(575) 430-2486

Documents

Posted documents for Award Notice W912PP22Q0007

Question & Answer

Award Notifications

Agency published notification of awards for Award Notice W912PP22Q0007

Contract Awards

Prime contracts awarded through Award Notice W912PP22Q0007

Similar Active Opportunities

Open contract opportunities similar to Award Notice W912PP22Q0007

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > W075 ENDIST ALBUQUERQUE
FPDS Organization Code
2100-W912PP
Source Organization Code
100221490
Last Updated
Feb. 16, 2022
Last Updated By
glenda.d.kohlieber@usace.army.mil
Archive Date
Feb. 16, 2022