BIL Funded - Eugene Airport (EUG) ATCT Elevator Modernization

ID: 1EUG • Type: Solicitation

Description

The elevator that serves the Airport Traffic Control Tower (ATCT) at the Eugene (EUG) Airport (Eugene, OR) was installed in 1986. The elevator is an electric basement geared traction elevator has a 2500-pound car weight rating with a speed 150 Feet Per Minute (FPM) that serves 5 floors and stops. The elevator is the primary means of vertical transportation for the building and is the only elevator that serves the ATCT.
This elevator is in operational condition. This project will replace aging components including but not limited to INSERT FROM REPORT. The project will also bring the elevator up to the most recent version of the ASME A17.1 elevator code.

Background
The Federal Aviation Administration (FAA) has issued a solicitation for the modernization and preventive service maintenance agreement of the elevator that serves the Airport Traffic Control Tower (ATCT) at the Eugene (EUG) Airport in Eugene, OR. The elevator was installed in 1986 and is the primary means of vertical transportation for the building.

Work Details
The scope of work includes a professional assessment to identify all elevator deficiencies, followed by a modernization of the elevator and its components in accordance with the latest edition of the American Society of Mechanical Engineers (ASME) A17.1 'Safety Code for Elevators and Escalators'. The contractor is required to replace aging components such as elevator controller, hoistway and switches, drive machine and sheaves, governor and safety systems, car structure, elevator cab, hoistway door panels, signal and operating fixtures, painting, fire life safety system, asbestos-containing materials, and other necessary components identified to be non-compliant with ASME A17.1. Additionally, full-service maintenance warranty, inspection, and testing of the elevators are required as per ASME A17.1.

Period of Performance
The performance period is negotiable but must begin within 5 calendar days after receiving the notice to proceed. The FAA intends to issue the Notice to Proceed (NTP) within 45 days after contract award date.

Place of Performance
The construction projects will be performed at the Airport Traffic Control Tower (ATCT) at the Eugene (EUG) Airport in Eugene, OR.

Overview

Response Deadline
March 10, 2024, 2:00 p.m. EDT (original: Feb. 29, 2024, 1:00 p.m. EST) Past Due
Posted
Jan. 23, 2024, 9:31 a.m. EST (updated: Jan. 23, 2024, 12:39 p.m. EST)
Set Aside
Small Business (SBA)
Place of Performance
Eugene, OR 97402 United States
Source
SAM

Current SBA Size Standard
$22 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
57% of obligations for similar contracts within the Federal Aviation Administration were awarded full & open.
On 1/23/24 Southwestern Region issued Solicitation 1EUG for BIL Funded - Eugene Airport (EUG) ATCT Elevator Modernization due 3/10/24. The opportunity was issued with a Small Business (SBA) set aside with NAICS 238290 (SBA Size Standard $22 Million) and PSC Z1BA.
Primary Contact
Name
Rodgers Cox   Profile
Phone
None

Documents

Posted documents for Solicitation 1EUG

Question & Answer

Incumbent or Similar Awards

Contracts Similar to Solicitation 1EUG

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 1EUG

Similar Active Opportunities

Open contract opportunities similar to Solicitation 1EUG

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL AVIATION ADMINISTRATION > 697DCK REGIONAL ACQUISITIONS SVCS
FPDS Organization Code
6920-697DCK
Source Organization Code
500000015
Last Updated
March 25, 2024
Last Updated By
rodgers.l.cox@faa.gov
Archive Date
March 25, 2024