Search Contract Opportunities

Array Group Driver Integration and Testing

ID: FA8723-24-R-9002 • Type: Sources Sought

Description

The Array Group Driver (AGD) Integration and Testing (AGD I&T) project will integrate and test seven newly purchased AGD cabinets with a previously qualified design which is a Form, Fit, Function, Interface (F3I) replacement plus critical spares for refurbished cabinets for Upgraded Early Warning Radars (UEWR). This AGD I&T project will integrate/test seven replacement AGD cabinets at three UEWRs at Thule Radar Site (THL), Royal Air Force (RAF) Fylingdales (FYL), and Clear Space Force Station (CLR).

Background
The Array Group Driver (AGD) Integration and Testing (AGD I&T) project aims to integrate and test seven newly purchased AGD cabinets with a previously qualified design, which is a Form, Fit, Function, Interface (F3I) replacement plus critical spares for refurbished cabinets for Upgraded Early Warning Radars (UEWR). The project will integrate/test seven replacement AGD cabinets at three UEWRs at Thule Radar Site (THL), Royal Air Force (RAF) Fylingdales (FYL), and Clear Space Force Station (CLR). The US Space Force, Space Systems Command (SSC), Strategic Warning and Surveillance Systems-Hardware Branch (SZQR) procures and sustains systems providing Missile Warning (MW), Missile Defense (MD), and Space Domain Awareness (SDA) capabilities in support of US and international activities.

Work Details
The scope of this effort will provide expertise and engineering to SSC/SZQR through a partnership with a contractor in support of the following major lines of effort during a 12-month Period of Performance (PoP):
- Install AGD cabinets at THL
- Integrate AGD cabinets at THL, FYL, and CLR
- Test AGD cabinets at THL, FYL, and CLR
- Train site personnel on AGD cabinets at THL, FYL, and CLR
- Dispose of legacy AGD cabinets at THL, FYL, and CLR. The contractor shall install, integrate, and test two AGD cabinets at THL in FY24; integrate and test three AGD cabinets at FYL in FY25; integrate and test two AGD cabinets at CLR in FY25. The contractor shall also provide materials as required for mitigation of risks associated with the installation and integration of the cabinets after receiving approval from the Government.

Period of Performance
12-month Period of Performance

Place of Performance
Thule Radar Site (THL), Royal Air Force (RAF) Fylingdales (FYL), Clear Space Force Station (CLR)

Overview

Response Deadline
March 14, 2024, 6:00 p.m. EDT Past Due
Posted
March 4, 2024, 6:40 p.m. EST
Set Aside
None
Place of Performance
Colorado Springs, CO 80914 United States
Source
SAM

Current SBA Size Standard
1350 Employees
Pricing
Multiple Types Common
Est. Level of Competition
Low
On 3/4/24 AFLCMC Peterson AFB issued Sources Sought FA8723-24-R-9002 for Array Group Driver Integration and Testing due 3/14/24. The opportunity was issued full & open with NAICS 334511 and PSC 5840.
Primary Contact
Name
Faith Macklen   Profile
Phone
(719) 373-5733

Secondary Contact

Name
James Lovely   Profile
Phone
None

Documents

Posted documents for Sources Sought FA8723-24-R-9002

Question & Answer

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought FA8723-24-R-9002

Similar Active Opportunities

Open contract opportunities similar to Sources Sought FA8723-24-R-9002

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE AIR FORCE > AFMC > AIR FORCE LIFE CYCLE MANAGEMENT CENTER > BATTLE MANAGEMENT > FA8723 AFLCMC HBQK C BM
FPDS Organization Code
5700-FA8723
Source Organization Code
500018910
Last Updated
March 29, 2024
Last Updated By
james.lovely.1@us.af.mil
Archive Date
March 29, 2024